Home -> Completed Projects
 
 
Pre-bid Engineering Service for Development of Ajmer-Nagour Section of NH-89 in the State of Rajast

Pre-bid Engineering Service for Development of Ajmer-Nagour

Section of NH-89 in the State of  Rajasthan

_________________________________________________________________________________________

 

Country: IndiaAjmer Nagour NH-89
 
Project Location within country:

Maharashtra, India

Professionals Senior Staff Provided:

·         No. of Staff :                      5

·         No. of person-months :       10

Name of Client

Piramal Roads Infra Ltd.

Start Date (mo/yr)                  

Nov 2011
Completion Date (mo/yr)

Dec 2011
 
Length: 100 km (4 Lane)
 
Project cost: INR 85,400,000,000

Approx. Value of firm's Services

INR 1,500,000/USD 33,400

_________________________________________________________________________________________

Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm -NA

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

S Mondal             Highway Engineer

Sudipta Dey         Bridge Engineer

A Jain                  Tranportation Planner

S Chatterjee         Quantity Surveyor

RD Sharma          Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

______________________________________________________________________________________

Detailed Narrative Description of Project

This road is Major Connectivity between Ajmer and Nagaur

______________________________________________________________________________________

Description of Services Provided

o    Road Inventory

o    Traffic Survey and Analysis

o    Soil and Sub-soil Investigation

o    Inventory of Minor Bridges and other cross drainage structures

o    Quantification and Costing

o    Bid Preparation.

 

 

 

Pre-bid Engineering Service for Development of Ganganagar-Suratgarh Section of NH-15 in the State of
Pre-bid Engineering Service for Development of Ganganagar-
 
SuratgarhSection of NH-15 in the State of Rajasthan
 

_________________________________________________________________________________________

Country: IndiaGanganagar Suratghar NH 15

Project Location within country:

Maharashtra, India

Professionals Senior Staff Provided:

·         No. of Staff :                      5

·         No. of person-months :       10

Name of Client

Piramal Roads Infra Ltd.

Start Date (mo/yr)

Nov 2011

Completion Date (mo/yr)
Dec 2011
 
Length: 70 km (4 Lane)
 
Project cost: INR 5,600,000,000

Approx. Value of firm's Services

INR 1,000,000/USD 22,222

_________________________________________________________________________________________

Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm -NA

_________________________________________________________________________________________

Senior Staff involved and Functions Performed

S Mondal             Highway Engineer

Sudipta Dey         Bridge Engineer

A Jain                  Tranportation Planner

S Chatterjee         Quantity Surveyor

RD Sharma          Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

________________________________________________________________________________________

Detailed Narrative Description of Project

This road is Major Connectivity between Ganganagar and Suratgarh

_________________________________________________________________________________________

Description of Services Provided

o    Road Inventory

o    Traffic Survey and Analysis

o    Soil and Sub-soil Investigation

o    Inventory of Minor Bridges and other cross drainage structures

o    Quantification and Costing

o    Bid Preparation.

Pre-bid Engineering Service for Development of Bikaner-Suratgarh Section of NH-15 in the State of Ra

Pre-bid Engineering Service for Development of Bikaner-Suratgarh

Section of NH-15 in the State of Rajasthan

___________________________________________________________________________________________

Country: IndiaBikaner Suratgarh NH-15

Project Location within country:

Maharashtra, India

Professionals Senior Staff Provided:

·         No. of Staff :                      5

·         No. of person-months :       10

Name of Client

MBL InfrastructursLimited
__________________________________________________________________________________________

Start Date (mo/yr)

Nov 2011

Completion Date (mo/yr)

Dec 2011
 
Length: 165 km (4 Lane)

Project cost: INR 85,400,000,000

Approx. Value of firm's Services

INR 1,500,000/USD 33,400

_________________________________________________________________________________________

Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm -NA

_________________________________________________________________________________________

Senior Staff involved and Functions Performed

S Mondal             Highway Engineer

Sudipta Dey         Bridge Engineer

A Jain                  Tranportation Planner

S Chatterjee         Quantity Surveyor

RD Sharma          Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

_________________________________________________________________________________________

Detailed Narrative Description of Project

This road is Major Connectivity between Bikaner and Suratgarh

_________________________________________________________________________________________

Description of Services Provided

o    Road Inventory

o    Traffic Survey and Analysis

o    Soil and Sub-soil Investigation

o    Inventory of Minor Bridges and other cross drainage structures

o    Quantification and Costing

o    Bid Preparation.

Pre-bid Engineering Service for Four laneing of Solapur-Maharashtra/Karnatka border section of NH-9

Pre-bid Engineering Service for Four laneing of

Solapur-Maharashtra/Karnatka border section

of NH-9 in the State of Maharashtra
_______________________________________________________________________________________
Country: IndiaSolapur Maharashtra

Project Location within country:

Maharashtra, India

Professionals Senior Staff Provided:

·         No. of Staff :                      5

·         No. of person-months :       10

Name of Client

Piramal Roads Infra Ltd.

_____________________________________________________________________________________

Start Date (mo/yr)                  

Sep 2011
Completion Date (mo/yr)
Oct 2011
 
Length: 100 km (4 Lane)
 
Project cost: INR 44,400,000,000

Approx. Value of firm's Services

INR 2,000,000/USD 40,500

__________________________________________________________________________________

Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm -NA

___________________________________________________________________________________

Senior Staff involved and Functions Performe:

S Mondal             Highway Engineer

Sudipta Dey         Bridge Engineer

A Jain                  Tranportation Planner

S Chatterjee         Quantity Surveyor

RD Sharma          Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

___________________________________________________________________________________

Detailed Narrative Description of Project

This road is Major Connectivity between Maharashtra and Karnataka

___________________________________________________________________________________

Description of Services Provided

o    Road Inventory

o    Traffic Survey and Analysis

o    Soil and Sub-soil Investigation

o    Inventory of Minor Bridges and other cross drainage structures

o    Quantification and Costing

o    Bid Preparation.

 
Pre-bid Engineering Service for Kishangarh-Udaipur-Ahmedabad Section NH-79A, 79, 76 & 8 in the state

Pre-bid Engineering Service for Kishangarh-Udaipur- Ahmedabad Section NH-79A, 79, 76 & 8 in the state of Rajasthan and Gujarat, India (Length-555km).

Country: India

Project Location within country:NH 79A

Rajasthan & Gujarat, India

Professionals Senior Staff Provided:

  • No. of Staff :                          10

  • No. of person-months :          20

Name of Client

GMR Infrastructure Ltd.

________________________________________________________________________________________

Start Date (mo/yr)                  

June 2011

Completion Date (mo/yr)
July 2011

Length: 555 km (6 Lane)

Project cost: INR 44,400,000,000

Approx. Value of firm's Services

INR 5,000,000/USD 115,000

________________________________________________________________________________________

Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm -NA

_______________________________________________________________________

Senior Staff involved and Functions Performed

A Bhattacharya              Highway Engineer

Sudipta Dey                   Bridge Engineer

A Jain                            Tranportation Planner

S Chatterjee                  Quantity Surveyor

RD Sharma                    Sr. Survey Engineer

Subhash Nigam             Geo-tech/ material Expart

________________________________________________________________________________________

Detailed Narrative Description of Project

The Government of India has mandated the National Highways Authority of India (NHAI) to implement the National Highway Development Project (NHDP). The National Highway-8 (NH-8) connects the national capital, Delhi and business capital of India, Mumbai. Upgrading the existing four lane highway to six lanes between these two major cities is a major and an integral component of the Government of India’s NHDP. The project is to be executed under DBFO pattern under NHDP Phase-V. Description of Services Provided.

________________________________________________________________________________________

Description of Services Provided

  • Soil and Sub-soil Investigation
  • Topographic Surveys using GPS, Total Station and Digital Level.
  • Inventory of Minor Bridges and other cross drainage structures
  • Geometric Design using latest highway design software
  • Generation of cross section at 50m interval
  • Quantification and Costing
  • Bid Preparation.
Preparation of Detailed Project Report of Dabok-Mavli-Kapasan-Chittor Road (Sh-9) in Rajasthan

 

Preparation of Detailed Project Report of Dabok-Mavli-Kapasan
-Chittor Road (Sh-9) in Rajasthan including a ROB

 

_________________________________________________________________________________

Debok Mavli Kapasan Chittor Road
Country: India                                                                                           

 

Project Location within country:

Rajasthan

Professionals Senior Staff Provided:

  • No. of Staff :                          8

  • No. of person-months :         14

Name of Client

RSRDC, Rajasthan

________________________________________________________________________________

Start Date (mo/yr)                  

Mar 2010

Completion Date (mo/yr)
Nov 2010

Length: 100km (4 Lane)

Project cost: 4000 million

Approx. Value of firm's Services

INR 3500000

__________________________________________________________________________________

Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm -NA

___________________________________________________________________________________

 

Senior Staff involved and Functions Performed

B Arindam                 Highway Designer

Sudipta De               Bridge Engineer

K Prassad                Tranportation Planner

Prabhat Biswas        Quantity Surveyor

Kanai Pal                 Sr. Survey Engineer

Subhash Nigam       Geo-tech/ material Expart

S Verma                   Environment Specialist

Madhusudan            Social Expert

____________________________________________________________________________________

 

Detailed Narrative Description of Project

This Road is a vital connection between Udaipur and Chittorgarh with Jaipur and Delhi. It is a parrallal connection with NH-76 of EW coridor

___________________________________________________________________________________

 

Description of Services Provided

o Traffic Survey and Forecast Analysis

o Soil and Sub-soil Investigation

o Topographic Surveys using GPS, Total Station and Digital Level.

o Design of Minor Bridges and other cross drainage structures

o Fixing of CD location through ditch profile analysis

o Geometric Improvement

o Geometric Design using latest highway design software

o Generation of cross section at 50m interval

o Quantification and Costing

o Bid Preparation

 

Preparation of Detailed Project Report of Hanumangarh-Suratgarh Road (MDR-103) in Rajasthan includin

 

Preparation of Detailed Project Report of Hanumangarh-Suratgarh Road (MDR-103) in Rajasthan including two ROBHanumangarh Suratgarh Road

 

Country: India

Project Location within country:

Rajasthan

Professionals Senior Staff Provided:

  • No. of Staff :                        8

  • No. of person-months :         14

Name of Client

RSRDC, Rajasthan


Start Date (mo/yr)                  

May 2010

Completion Date (mo/yr)
Nov 2010

Length: 54km (4 Lane)

(Including two ROB of 25x2+35+25x2m PSC, Major Bridge of 4x27m PSC over Gaggar river)

Project cost: 2000 million

Approx. Value of firm's Services

INR 3000000


Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm -NA


 

Senior Staff involved and Functions Performed

Col A Madan             Highway Designer

SM Ghosh                Bridge Engineer

P Joshi                     Tranportation Planner

Prabhat Biswas        Quantity Surveyor

RD Sharma              Sr. Survey Engineer

Subhash Nigam        Geo-tech/ material Expart

S Verma                   Environment Specialist

Madhusudan            Social Expert


 

Detailed Narrative Description of Project

This is major connection between Panjub (Bhatinda) and south Rajasthan.


 

Description of Services Provided

o Traffic Survey and Forecast Analysis

o Soil and Sub-soil Investigation

o Topographic Surveys using GPS, Total Station and Digital Level.

o Design of Minor Bridges and other cross drainage structures

o Fixing of CD location through ditch profile analysis

o Geometric Improvement

o Geometric Design using latest highway design software

o Generation of cross section at 50m interval

o Quantification and Costing

o Bid Preparation

Preparation of Detailed Project Report of Pali-Gomti Road (SH-16&67) in Rajasthan.

 

Preparation of Detailed Project Report of Pali-Gomti Road (SH-16&67) in Rajasthan Pali Gomti Road

 

Country: India

Project Location within country:

Rajasthan

Professionals Senior Staff Provided:

  • No. of Staff :                        6

  • No. of person-months :         12

Name of Client

RSRDC, Rajasthan


Start Date (mo/yr)                  

May 2010

Completion Date (mo/yr)
Nov 2010

Length: 105km (2 Lane)

Project cost: 1800 million

Approx. Value of firm's Services

INR 3700000


Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm -NA


 

Senior Staff involved and Functions Performed

Subhas Malhotra      Highway Designer

Sudipta De               Bridge Engineer

K Prassad                Tranportation Planner

Prabhat Biswas        Quantity Surveyor

RD Sharma              Sr. Survey Engineer

Subhash Nigam       Geo-tech/ material Expart

S Verma                   Environment Specialist

Madhusudan            Social Expert


 

Detailed Narrative Description of Project

Major connection between Pali/Jodhpur and Udaipur


 

Description of Services Provided

o Traffic Survey and Forecast Analysis

o Soil and Sub-soil Investigation

o Topographic Surveys using GPS, Total Station and Digital Level.

o Design of Minor Bridges and other cross drainage structures

o Fixing of CD location through ditch profile analysis

o Geometric Improvement

o Geometric Design using latest highway design software

o Generation of cross section at 50m interval

o Quantification and Costing

o Bid Preparation

Preparation of Detailed Project Report of Shillong Nongstoin, NH 44E in Meghalaya (Hill Road)

 

Preparation of Detailed Project Report of Shillong – Nongstoin, NH 44E in Meghalaya (Hill Road)NH 44E

 

Country: India

Project Location within country:

Meghalaya

Professionals Senior Staff Provided:

  • No. of Staff :                          7

  • No. of person-months :         16

Name of Client

PWD, Shillong, Meghalaya


Start Date (mo/yr)                  

May 2009

Completion Date (mo/yr)
Jan 2010

Length: 83km

Project cost: 3280 million

Approx. Value of firm's Services

INR 5,200,000


Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm – Constell Consultants Pvt. Ltd., Kolkata

 


 

Senior Staff involved and Functions Performed

B Arindam            Highway Designer

C D Singh            Bridge Engineer

Akshat Jain          Tranportation Planner

Prabhat Biswas    Quantity Surveyor

R D Sharma         Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

S Verma              Environment Specialist

 


 

Detailed Narrative Description of Project

This Road in situated in Hilly area in Meghalaya and connect the State capital of Meghalaya and Nonstong. This road has some sharp curve. Around 30 numbers Minor bridge and more than 400 culverts are totally replaced with new structures. Bypass starting from ch 6th to 20th also included.

 


 

Description of Services Provided

o Traffic Survey and Forecast Analysis

o Soil and Sub-soil Investigation

o Topographic Surveys using GPS, Total Station and Digital Level.

o Design of Minor Bridges and other cross drainage structures

o Fixing of CD location through ditch profile analysis

o Geometric Improvement

o Geometric Design using latest highway design software

o Generation of cross section at 50m interval

o Quantification and Costing

o Bid Preparation

 

Preparation of Detailed Project Report of RSN road at William Nagar in Meghalaya (Hill Road.)

Preparation of Detailed Project Report of RSN road at William Nagar in Meghalaya (Hill Road)

Meghalaya Hill Road

Country: India

Project Location within country:

Meghalaya

Professionals Senior Staff Provided:

  • No. of Staff :                        7

  • No. of person-months :         16

Name of Client

PWD, Shillong, Meghalaya


Start Date (mo/yr)                  

May 2009

Completion Date (mo/yr)
Jan 2010

Length: 83km

Project cost: 1070 million

Approx. Value of firm's Services

INR 1,300,000


Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm – Constell Consultants Pvt. Ltd., Kolkata


 

Senior Staff involved and Functions Performed

B Arindam            Highway Designer

C D Singh            Bridge Engineer

Akshat Jain          Tranportation Planner

Prabhat Biswas    Quantity Surveyor

R D Sharma         Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

S Verma              Environment Specialist


 

Detailed Narrative Description of Project

This road is connecting NH62 near Nenkhra to Williamnagar. It is situated in hilly region and has some sharp turn. Total 22 nos. Minor bridges and more than 100 culverts should be replaced with new structures.


 

Description of Services Provided

o Traffic Survey and Forecast Analysis

o Soil and Sub-soil Investigation

o Topographic Surveys using GPS, Total Station and Digital Level.

o Design of Minor Bridges and other cross drainage structures

o Fixing of CD location through ditch profile analysis

o Geometric Improvement

o Geometric Design using latest highway design software

o Generation of cross section at 50m interval

o Quantification and Costing

o Bid Preparation

Design & Cost Estimation of different Crossing in Sector 18 & 37 including the proposed Underpass

 

Design & Cost Estimation of different Crossing in Sector 18 & 37 including the proposed Underpass at Sector 18 in NOIDA

 

Country: India

Project Location within country:

NOIDA, Uttar Pradesh         

Professionals Senior Staff Provided:

  • No. of Staff :                          5

  • No. of person-months :         22

Name of Client

NOIDA, UP

Sec-19, NOIDA, UP


Start Date (mo/yr)                  

May 2009

Completion Date (mo/yr)
Aug 2009

Length: 45km

Project cost: 75 million

Approx. Value of firm's Services

INR 1,410,000


Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm – N/A


 

Senior Staff involved and Functions Performed

Akshat Jain          Traffic Engineer cum Transport Ecconomist

R D Sharma         Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

B Arindam            Project Co-ordinator cum Highway Design Engineer

CD Sing               Bridge Engineer


 

Detailed Narrative Description of Project

This project is detail design of underpass and adjoint Road and junctions, Making final alignment and profile

Structures:

Total Length - 350 m and approaches with Return Wall


 

Description of Services Provided

o Traffic Survey and Forecast Analysis and estimation of Tollable Traffic        o Topographical Survey

o Soil Investigation

o Earth Work Calculation using GPS and Digital maps.

o Design of Underpass and Road

Preparation of DPR with Design & cost Estimation of Trumpet Flyover at NOIDA Film City Crossing.

 

Preparation of Detailed Project Report with Design & cost Estimation of Trumpet Flyover at NOIDA Film City Crossing near Shiv Mandir.

Noida Flyover

Country: India

Project Location within country:

NOIDA, Uttar Pradesh         

Professionals Senior Staff Provided:

  • No. of Staff :                          5

  • No. of person-months :         22

Name of Client

NOIDA, UP

Sec-19, NOIDA, UP


Start Date (mo/yr)                  

Dec 2008

Completion Date (mo/yr)
Mar 2009

Length: 45km

Project cost: 220 million

Approx. Value of firm's Services

INR 2,470,000


Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm – N/A


 

Senior Staff involved and Functions Performed

Akshat Jain          Traffic Engineer cum Transport Ecconomist

R D Sharma         Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

B Arindam            Project Co-ordinator cum Highway Design Engineer

CD Sing               Bridge Engineer


 

Detailed Narrative Description of Project

This project is detail design of Flyover for solving the existing Traffic in Noida. Total 2km length of this structure including approach RE wall.

Structures:

Total Length - 2000 m and approaches with RE wall


 

Description of Services Provided

o Traffic Survey and Forecast Analysis and estimation of Tollable Traffic         o Topographical Survey

o Soil Investigation

o Earth Work Calculation using GPS and Digital maps.

o Design of Flyover and Junctions

Preparation of Detailed Project Report for Khairagarh Lanjhi Road, Chattisgarh.

 

Preparation of Detailed Project Report for Khairagarh – Lanjhi Road,  Chattisgarh.

Lanjhi Road

Country: India

Project Location within country:

Chhattisgarh 

Professionals Senior Staff Provided:

  • No. of Staff :                         8

  • No. of person-months :         22

Name of Client

Chhattisgarh Highways Development Company Ltd., Raipur


Start Date (mo/yr)                  

May 2008

Completion Date (mo/yr)
Mar 2009

Length: 37km

Project cost : 1130 million

Approx. Value of firm's Services

INR 4,000,000


Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm – Zaidun-Leeng (I) Pvt. Ltd., Gurgaon



 

Senior Staff involved and Functions Performed

Col Ashok MadanTeam Leader cum Sr. Highway Engineer

Akshat Jain          Traffic Engineer cum Transport Ecconomist

S Raina                Quantity Surveyor

R D Sharma         Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

Dr. Ravishankar    Environment Specialist

B Arindam            Project Co-ordinator cum Highway Design Engineer

CD Sing               Bridge Engineer



 

Detailed Narrative Description of Project

This road connects the town of Khairagarh with Lanjhi after the state border. Since the road from Durg (Bypass) and Khairagarh is already developed, with the improved quality this route forms a part of the short cut between Raipur and Gondia, Balaghat areas of Madhya Pradesh. It passe through plain as well as hilly terrain of Maikala Range.

Structures:

Str 1/1: 18 x 3 = 54m river bridge

Str 18/1: 18 x 3 = 54m hilly nalla.


 

Description of Services Provided

o Traffic Survey and Forecast Analysis

o Soil and Sub-soil Investigation

o Topographic Surveys using GPS, Total Station and Digital Level.

o Design of two Minor Bridges and other cross drainage structures

o Fixing of CD location through ditch profile analysis

o Geometric Improvement

o Geometric Design using latest highway design software

o Generation of cross section at 50m interval

o Quantification and Costing

o Bid Preparation

Preparation of Detailed Project Report for the Elevated Road over the canal in Raipur City, Chattis

 

Preparation of Detailed Project Report for the Elevated Road over the canal in Raipur City,  Chattisgarh.canel in Raipur

 

Country: India

Project Location within country:

Chattisgarh

Professionals Senior Staff Provided:

  • No. of Staff :                        8
  • No. of person-months :         22

Name of Client

Chhattisgarh Highways Development Company Ltd., Raipur

Start Date (mo/yr)                  

Apr 2008
Completion Date (mo/yr)
Sep 2008
Length: 7km

Project cost: 1560 million

Approx. Value of firm's Services

INR 2,900,000


Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm – Zaidun-Leeng (I) Pvt. Ltd., Gurgaon


Senior Staff involved and Functions Performed

Col Ashok MadanTeam Leader cum Sr. Highway Engineer

Akshat Jain          Traffic Engineer cum Transport Ecconomist

S Raina                Quantity Surveyor

R D Sharma         Sr. Survey Engineer

Subhash Nigam    Geo-tech/ material Expart

Dr. Ravishankar    Environment Specialist

B Arindam            Project Co-ordinator cum Highway Design Engineer

CD Sing               Bridge Engineer


Detailed Narrative Description of Project

In old days there was canal in use just skirting the Raipur town. With the time the city has been increased in manyfold and that canal is presently become disused. However, the Govt. of Chhattisgarh has taken an initiative to develop the canal corridor as a elevated city road. This has got seven intersection inside the city and with the radial roads. The project was aimed at not to disturb the existing cross section / water way of the canal but to provide a elevated corridor by means of a continuous structures. This will have connection with the cross road at obligatory points.


Structures:

Total Length of Elevated Road in 7.0 Km


Description of Services Provided

o Traffic Survey and Forecast Analysis

o Soil and Sub-soil Investigation

o Topographic Surveys using GPS, Total Station and Digital Level.

o Design of Elevated Flyover

o Geometric Improvement

o Geometric Design using latest highway design software

o Generation of cross section at 50m interval

o Quantification and Costing

o Bid Preparation

 

Preliminary Engineering for Selective Road in Gurgaon

 

Preliminary Engineering for Selective Road in Gurgaon

 

Country: India

Project Location within country:
Gurgaon

Professional Senior Staff Provided

  • No. of Staff                            5

  • No. of person-months           16

Name of Client

DLF-WSP, Gurgaon   


Start Date (mo/yr)                   May 2008

Completion Date (mo/yr)          Sept 2008

Project Cost:

4500 million

Approx. Value of firm's Service

INR 48,00,000


Name of Associated Firms

Man Months of Professional Staff Provided by Associated Firm – Nil


Senior Staff involved and Functions Performed

B Arindam            Highway Designer

C D Singh            Bridge Engineer

R Chowdhury        Bridge Engineer

Akshat Jain          Tranportation Planner

Prabhat Biswas    Quantity Surveyor



 

Detailed Narrative Description of Project

This is a project to be taken up mainly by DLF in cost sharing and handing over the facility to HUDA finally.  

Finalisation of total transportation scheme from DLF Gateway Tower to DLF Golf Course-II. Planning of structures to be introduced in consultation with DMRC. Aftre finalization of structure it was three underpasses of tow way 4-lane configuration each and another two underpasses oneway of 4-lane configuration and two flyovers of 8-lane (20mx12+35mx2+55m) another oneway 4-lane flyover on curve at Sikanderpur junction 3-lane (20mx4+57m+35mx2).

Structures:

SN

Major Structures

Lane Width (m)

Str. / Covered Length (m)

RE Wall/ Open Length (m)

Total Length (m)

1

4-Lane Underpass besides Slip Road of NH 8 at Shankarpur Chowk on Udyog Vihar side

12

60

477

537

2

4-Lane Underpass besides Slip Road of NH 8 at Shankarpur Chowk on Gateway Tower side

12

70

450

520

3

2 x 4 Lane Underpass at Nathupur Junction

2 x 12

60

497

557

4

2 x 4 Lane Main Underpass at Sikanderpur

2 x 12

617

418

1035

5

2-lane Right-Turn Underpass at Sikanderpur

7

258

343

601

6

Flyover at Faridabad intersection

2 x 12

(2x30)+(3x30)+(3x30)+(30+40+30)

+2x30=400

190x2=380

780

7

Flyover at sector 43/26A and sector 53/54 intersection

2 x 12

(3x30)x8+

(30+40+30)+(3x30)x2=1000

200x2=400

1400

8

Unidirectional Flyover at Sinkanderpur junction.

1x7

(4x30)+(3x30)+(39+43+30)+

(3x30)=412

177.5x2=355

767



 

Description of Services Provided

  • Optimization of proposed road design

  • Optimization of Proposed Structures

  • Preliminary Design of Structures.

  • Design of Interchanges.

  • Quantification and optimized costing

Pre-bid Engineering for Ganga Expressway under BOT Scheme

Pre-bid Engineering for Ganga Expressway under BOT Scheme

Ganga Expressway

Country: India

Project Location within country:
uttar Pradesh

Professional Senior Staff Provided

  • No. of Staff                          4

  • No. of person-months           8

Name of Client

Electrosteel Infrastructure Services, Kolkata


Start Date (mo/yr)                   Dec 2007

Completion Date (mo/yr)          Jan 2008

Approx. Value of firm's Service

INR 1,250,000


Name of Associated Firms

Man Months of Professional Staff Provided by Associated Firm – Nil


Senior Staff involved and Functions Performed

B Arindam            Highway Designer

C D Singh            Bridge Engineer

Akshat Jain          Tranportation Planner

Prabhat Biswas    Quantity Surveyor



 

Detailed Narrative Description of Project

The traffic volumes and demand for road transport in India particularly the National Highways were witnessing high growth rates. Envisaging this upward trend in the future years, Government of Uttar Pradesh has taken up an initiative to develop an Expressway Corridor entirely passing through the state from north to south covering up 1000 km of length.

The UP Govt. has taken up a green and very ambitious project of 8-lane corridor flanked with service roads on both sides. The purpose of the road was projected in two ways; road network and a bund for flood control in Ganga Basin on the eastrn side.


Description of Services Provided

  • Optimization of proposed road design

  • Optimization of Proposed Structures

  • Design of Interchanges with loops and ramps.

  • TollPlazadesign

  • Preparation of Scheme for ITS including Toll Plaza

  • Preparation of Scheme for Complete Electrification

  • Quantification and optimized costing

Technical Audit of Detailed Project Report of 8 corridors in Nagaland for 2-Laning

 

Technical Audit of Detailed Project Report of 8 corridors
in Nagaland for 2-Laning

 

Country: India

Project Location within country:

Nagaland 

Professionals Senior Staff Provided:

  • No. of Staff :                        9

  • No. of person-months :         28

Name of Client

Director Tourism, Nagaland

__________________________________________________________________________________________

Start Date (mo/yr)                  

Jan 2008
Completion Date (mo/yr)
Feb 2008
Length : 40km

Approx. Value of firm's Services

INR 50,000

__________________________________________________________________________________________

Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm – Nil

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam            Project Co-ordinator cum Highway Design Engineer

Prabhat Biswas    Quantity Surveyor

__________________________________________________________________________________________

Detailed Narrative Description of Project

This was to facilitate the govt. of Nagaland in obtaining a grant sanction from the Pradhan Mantri Fund for Development in North-east sector. Some exisiting DPR for 8 corriodrs were to review to check its accuracy and to update the cost of the project with the new rates.


Coridor Details:

  • Construction of State Border Road to Longwa Road, Mon District.                        3.85km
  • Construction of Yikhum to Riphyim Yanhen Road via Englan, Wokha District.    3.5km
  • Construction of State Border Road to New Thewati Village, Phek District.            6km
  • Construction of State Border Road to Ghukiye Village, Zunhebotot District.          5km
  • Construction of State Border Road to Sukhayi Village, Zunheboto District.           8km
  • Construction of Tiju Junction to Sukhayi Village, Zunheboto District.                      13km

Description of Services Provided

  • Review of Design and reports

  • Calculation of new unit rates

  • Quantification and Costing

  • Preparation of Report

Pre-bid Engineering for Chilkaluripet Vijaywada, NH 5 Under DBFO Scheme

 

Pre-bid Engineering for Chilkaluripet – Vijaywada,
NH 5 Under DBFO Scheme

Vijaywada

Country: India

Project Location within country:
Andhra Pradesh

Professional Senior Staff Provided

  • No. of Staff                           4

  • No. of person-months           8

Name of Client

Electrosteel Infrastructure Services, Kolkata  

______________________________________________________________________    

Start Date (mo/yr)                   June 2005

Completion Date (mo/yr)          July 2005

Approx. Value of firm's Service

INR 500,000

______________________________________________________________________________

Name of Associated Firms

Man Months of Professional Staff Provided by Associated Firm – Nil

________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam              Highway Designer

R Chowdhury         Bridge Engineer

A Jain                    Tranportation Planner

S Chakravorty        Quantity Surveyor

Detailed Narrative  Description of Project

______________________________________________________________________________

The traffic volumes and demand for road transport in India particularly the National Highways were witnessing high growth rates. Envisaging this upward trend in the future years, Ministry of Surface Transport has entrusted the implementation of NHDP corridor on NHAI. The NAHI has taken up the existing four-lane corridor for converting it to 6-lane configuration. Pricipally the improvement of these corridors has been proposed to be implemented through NHAI under financial format of BOT basis.

_______________________________________________________________________________

Description of Services Provided

  • Develop financial modeling for risk analysis

  • Modeling for Grant Requirement Vs. Viability

Pre-bid Engineering for Chennai Tada, NH 5 Under DBFO Scheme

Pre-bid Engineering for Chennai – Tada,
NH 5 Under DBFO Scheme

NH-5

Country: India

Project Location within country:
Gujrat

Professional Senior Staff Provided

  • No. of Staff                           2

  • No. of person-months           2

Name of Client

Electrosteel Infrastructure Services, Kolkata    

_________________________________________________________________________  

Start Date (mo/yr)                   Nov 2007

Completion Date (mo/yr)          Nov 2007

Approx. Value of firm's Service

INR 450,000

_________________________________________________________________________________

Name of Associated Firms

Man Months of Professional Staff Provided by Associated Firm – Nil

________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam               Highway Engineer

Akshat Jain             Tranport Ecconomist

Detailed Narrative   Description of Project

_______________________________________________________________________________

The traffic volumes and demand for road transport in India particularly the National Highways
were witnessing high growth rates. Envisaging this upward trend in the future years, Ministry
of Surface Transport has entrusted the implementation of NHDP corridor on NHAI. The NAHI
has taken up the existing four-lane corridor for converting it to 6-lane configuration. Pricipally
the improvement of these corridors has been proposed to be implemented through NHAI
under financial format of BOT basis.

__________________________________________________________________________________

Description of Services Provided

  • Develop financial modeling for risk analysis

  • Modeling for Grant Requirement Vs. Viability

Pre-bid Engineering for Mumbai Trans Hurbour Link (MTHL - Highway Part) Connecting Sweri with NSP

 

Pre-bid Engineering for Mumbai Trans Hurbour Link (MTHL -
Highway Part) Connecting Sweri with Nava Shiva Port

MTHL

Country: India

Project Location within country:
Mumbai

Professional Senior Staff Provided

  • No. of Staff                            6

  • No. of person-months           14

Name of Client

SYSTRA-MVA India Pvt. Ltd.

___________________________________________________________________________________

Start Date (mo/yr)                   Oct 2007

Completion Date (mo/yr)          Jan 2008

Approx. Value of firm's Service

INR 675,000

___________________________________________________________________________________

Name of Associated Firms

Man Months of Professional Staff Provided by Associated Firm – SYSTRA

___________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam                Highway Designer

A Jain                       ITS Planner

Prabhat Biswas        Quantity Surveyor

Vinod Nagrecha       Electrical Engineer

Pravin Joshi             Environment Specialist

S Thakur                  Architect

Detailed Narrative    Description of Project

___________________________________________________________________________________

The project is a very prestigious in nature. It’s a elevated connetion of 22.6 km 6-lane
expressway over the see to connect Sweri with Nava Shiva Port side at Chirle. The pre-bid
engineering was done for the Reliance Infrastructure (ADAG).

The involved complete review of the alignment to make it a cost effective finally. One balance
cantilever and two cable stayed bridges were proposed on the alignment. The final alignment
was to match the required grade keeping the high spring level at same level. Design of
approaches including the interchanges at both ends. Review and study the environmental
issues. Complete electrification scheme and the Inteligent Transportation System installation
scheme including Toll Plaza for BOT operation.

___________________________________________________________________________________

Description of Services Provided

  • Optimization of proposed road design

  • Matching the design for both Cable Stayed Portions

  • Optimization of Proposed Structures in approaches

  • Design of Interchanges with loops and ramps.

  • TollPlazadesign

  • Preparation of Scheme for ITS including Toll Plaza

  • Preparation of Scheme for Complete Electrification

  • Planning and design of Bird Observatory

  • Planning and design of Resque Center

  • Quantification and optimized costing

 

Preparation of Detailed Project Report for 4-Laning of Raipur-Bilaspur Road, NH 200 including ROB

Preparation of Detailed Project Report for 4-Laning of Raipur-Bilaspur
Road,NH 200 including ROBNH-200

 

Country: India

Project Location within country:

Chhattisgarh 

Professionals Senior Staff Provided:

  • No. of Staff :                          9

  • No. of person-months :         28

Name of Client

Chhattisgarh Highways Development Company Ltd., Raipur

__________________________________________________________________________________________

Start Date (mo/yr)                  

May 2007
Completion Date (mo/yr)
Oct 2007
Length: 45km

Project cost: 2040 million

Approx. Value of firm's Services

INR 4,500,000

__________________________________________________________________________________________

Name of Associated Firms :

Man Months of Professional Staff Provided by Associated Firm – Zaidun-Leeng (I) Pvt. Ltd., Gurgaon

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

Col Ashok MadanTeam Leader cum Sr. Highway Engineer

Akshat Jain               Traffic Engineer cum Transport Ecconomist

Prashant Joshi          Highway Engineer cum Pavemnt Specialist

S Raina                     Quantity Surveyor

R D Sharma              Sr. Survey Engineer

Subhash Nigam         Geo-tech/ material Expart

Dr. Ravishankar        Environment Specialist

Arun Kumar               Resettlement & Rehabilitation Specialist

B Arindam                 Project Co-ordinator cum Highway Design Engineer

CD Sing                    Bridge Engineer

__________________________________________________________________________________________

Detailed Narrative Description of Project

Raipurand Bilaspur are the two most important cities in Chhattisgarh. Earlier it was connected through State Highway 5. Looking at the importance the same has been up-graded to National Highway 200.The government of Chhattisgarh has decided to widen it to a 4-lane facility to cope up with the future traffic growth.

The work involved fixation of the approprite alignment after studying the existing road and topographic details, traffic flow, social and environmental activities around etc. This has benn done in consultation with local officers. A comprehensive alignment design has been done based on the elaborate study conducted. The assignment includes selection of alignment, Traffic Study, Soil and sub-soil exploration, quarry and borrow area identification, Topo survey and Analysis, prepation of Highway and Structural Drawings, Rate Analysis, preparation of BOQ and Costing and preparation of Bid Documents along with the bid drawings.

__________________________________________________________________________________________

Structures:

Minor Bridge at 83/6-2 – 3 x 4.2m = 12.6m

MajorBridge at 92/4-1 over Maniyari River – 8 x 15m = 120m

MinorBridgeat 113/6-2 – 3 x 4.3 = 12.9m

__________________________________________________________________________________________

Description of Services Provided

  • Traffic Survey and Forecast Analysis

  • Soil and Sub-soil Investigation

  • Topographic Surveys using GPS, Total Station and Digital Level.

  • Design of one Major and two Minor Bridges and other cross drainage structures

  • Fixing of CD location through ditch profile analysis

  • Geometric Improvement

  • Geometric Design using latest highway design software

  • Generation of cross section at 50m interval

  • Quantification and Costing

  • Bid Preparation

Preparation of Detailed Project Design of 140 Bridges for HSRDC, Haryana

 

Preparation of Detailed Project Design of 140 Bridges for HSRDC,
Haryana340 Bridges

 

Country: India

Project Location within country:

Haryana

Professionals Senior Staff Provided:

  • No. of Staff :                          3

  • No. of person-months :         15

Name of Client

Engineering Project (India) Ltd., New Delhi

__________________________________________________________________________________________

Start Date (mo/yr)                  

May 2007
Completion Date (mo/yr)
Ongoing

 

Approx. Value of firm's Services

INR 1,050,000

__________________________________________________________________________________________

Name of Associated Firms            

Man Months of Professional Staff Provided by Associated Firm – WAPCOS

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam                  Co-ordinator cum Alignment Specialist

Sanjoy Chatterjee      Highway Designer

Prabhat Biswas          Quantity Surveyor

N P Dutta                   Survey Engineer

______________________________________________________________________________

Detailed Narrative Description of Project

This was a project to rehabilitate 140 exisitng bridges after verifying their strength, loading pattern, residual life, existing lane configuration etc. to have a reconstruction decision. The HSIDC of Haryana has decided to take up the rehab and re-construction of such 140 bridges with in the State through a funding from NABAD.  

The work involved improvement of alignment after the topo survey with Total Station. Complete design of new approach roads and judiceously placed the new alignment to fulfill the site specific requirements. Preparation of the proposal for the new cross drainage structures and Calsulation of quantities. This has been done in consultation with local state Autoroties.

__________________________________________________________________________________________

Description of Services Provided

  • Topographical Survey with Total Station.

  • Design New Alignment involving Geometric Improvement

  • Fixing structure at new location through ditch profile analysis

  • Geometric Design using latest highway design software

  • Calculation of Quantities

Preparation of Detailed Project Design for MPRDC State Highways, Bhopal

 

Preparation of Detailed Project Design for MPRDC State Highways,
BhopalMPRDC

Country: India

Project Location within country:

Madhyapradesh       

Professionals Senior Staff Provided:

  • No. of Staff :                          4

  • No. of person-months :         22

Name of Client

Engineering Project (India) Ltd., New Delhi

__________________________________________________________________________________________

Start Date (mo/yr)                  

Dec 2006
Completion Date (mo/yr)
Jan 2008

Length: 75km
Approx. Value of firm's Services

INR 2,700,000

__________________________________________________________________________________________

Name of Associated Firms            

Man Months of Professional Staff Provided by Associated Firm – SMEC India Pvt. Ltd.

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam              Highway Engineer

Ranajit Jana           Highway Designer

Sanjoy Chatterjee  Highway Designer

Prabhat Biswas      Quantity Surveyor

______________________________________________________________________________

Detailed Narrative Description of Project

This was a project of SH 26 from Khandwa – Khargon a 75km stretch of single/double lane existing road in a two lane with paved shoulder standard road. The MPRDC of Madhya Pradesh has decided to take up the improvement and construction of State Highways.  

The work involved improvement of alignment. Complete design of roads and judiceously placed the road apparatances to fulfill the requirements. Preparation of the proposal for the new cross drainage structures and Calsulation of quantities. This has been done in consultation with local state Autoroties.

Description of Services Provided

  • Geometric Improvement

  • Fixing of CD location through ditch profile analysis

  • Design of other cross drainage structures

  • Geometric Design using latest highway design software

  • Generation of cross section at 50m interval

Preparation of Detailed Project Design of Banher Maharashtra Border, SH 31, Madhya Pradesh

 

Preparation of Detailed Project Design of Banher –Maharashtra Border,
SH 31, Madhya PradeshSH-31

 

Country: India

Project Location within country:

Uttaranchal            

Professionals Senior Staff Provided:

  • No. of Staff :                         4

  • No. of person-months :         8

Name of Client

Engineering Project (India) Ltd., New Delhi

__________________________________________________________________________________________

Start Date (mo/yr)                  

Jan 2007
Completion Date (mo/yr)
Aug 2007
Length : 66km

Approx. Value of firm's Services

INR 290,000

__________________________________________________________________________________________

Name of Associated Firms            

Man Months of Professional Staff Provided by Associated Firm – SMEC India Pvt. Ltd.

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam            Highway Engineer

Santosh Dixit        Design Engineer

R Chowdhury        Bridge Engineer

Prabhat Biswas    Quantity Surveyor

______________________________________________________________________________

Detailed Narrative Description of Project

This was a project from Banher to State Boredr of Maharashtra, a 66km of single lane existing road to be up-graded in to a two lane with paved shoulder standard road. The Corporation of PWD of Govt. of Madhya Pradesh took up the improvement and construction of State Highways through the funding of ADB.

The work involved improvement of alignment. Complete design of roads and judiceously placed the road apparatances to fulfill the requirements. Preparation of the proposal for the new cross drainage structures and Calsulation of quantities. This has been done in consultation with local state Autoroties.

__________________________________________________________________________________________

Description of Services Provided

  • Geometric Improvement

  • Fixing of CD location through ditch profile analysis

  • Design of other cross drainage structures

  • Geometric Design using latest highway design software

  • Generation of cross section at 50m interval

  • Calculation of quantities

Preparation of Detailed Project Design for Himalayan Highways, Uttaranchal

 

Preparation of Detailed Project Design for Himalayan Highways,Uttaranchal

 

Country: IndiaHimalayan Highways

Project Location within country:

Uttaranchal            

Professionals Senior Staff Provided:

  • No. of Staff :                         4

  • No. of person-months :         8

Name of Client

Engineering Project (India) Ltd., New Delhi

__________________________________________________________________________________________

Start Date (mo/yr)                  

Jan 2006
Completion Date (mo/yr)
Mar 2006
Length : 20km

Approx. Value of firm's Services

INR 250,000

__________________________________________________________________________________________

Name of Associated Firms            

Man Months of Professional Staff Provided by Associated Firm – SMEC India Pvt. Ltd.

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam               Highway Engineer

Ranajit Jana            Design Engineer

R Chowdhury          Bridge Engineer

Prabhat Biswas       Quantity Surveyor

______________________________________________________________________________

Detailed Narrative Description of Project

This was a project from Tipri (km 100) to Pokhal (Km 120), a 20km of single lane existing hill road in a two lane with paved shoulder standard road. The PWD of Govt. of Uttaranchal has decided to take up the improvement and construction of State Highways.  

The work involved improvement of alignment. Complete design of roads and judiceously placed the road apparatances to fulfill the requirements. Preparation of the proposal for the new cross drainage structures and Calsulation of quantities. This has been done in consultation with local state Autoroties.

__________________________________________________________________________________________

Description of Services Provided

  • Geometric Improvement

  • Fixing of CD location through ditch profile analysis

  • Design of other cross drainage structures

  • Geometric Design using latest highway design software

  • Generation of cross section at 50m interval

  • Calculation of quantities

Preparation of Detailed Project Report for 2/4-lane Bypass around Bagbahra

Preparation of Detailed Project Report for 2/4-lane Bypass around
Bagbahra2/4 Lane Bypass around Bagbahra

 

Country: India

Project Location within country:

Chhattisgarh           

Professionals Senior Staff Provided:

  • No. of Staff :                         6

  • No. of person-months :         32

Name of Client

R & B Department of Chhattisgarh, MOSRT&H

__________________________________________________________________________________________

Start Date (mo/yr)                  

Feb 2006
Completion Date (mo/yr)
Feb 2008


Approx. Value of firm's Services

INR 650,000

__________________________________________________________________________________________

Name of Associated Firms            

Man Months of Professional Staff Provided by Associated Firm – Vishwa Surveying Pvt. Ltd. New Delhi

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam            Alignment Specialist

Akshat Jain          Traffic Expart

Ranajit Jana         Highway Engineer

R Chowdhury       Bridge Engineer

S Chakravorty      Quantity Surveyor

D S Yadav            Geo-tech/ material Expart

Sudin Dasgupta    Draughtsman

______________________________________________________________________________

Detailed Narrative Description of Project

Bagbahra is yet to be town, presently it is under a Nagar Panchyet. However, this is in the process of becoming an urban centre in the state of Chhattisgarh and located on NH-217. In order to segregate traffic movements the R&B dept. of Chhattishgarh, proposed the construction of a 12 km 2/4-Lane divided bypass outside Bagbahra.

The work involved fixation of the approprite alignment after studying the topographic details, growth of the town, traffic flow etc. This has benn done in consultation with local officers of the department and other agencies like Nagar Panchayet of Bagbahra. A comprehensive alignment design has been done based on the elaborate study conducted. The assignment includes selection of alignment, Traffic Study and Analysis, prepation of Highway and Structural Drawings, Rate Analysis, preparation of BOQ and Costing.

______________________________________________________________________________

Description of Services Provided

  • Review of deapartmental suggestion concived earlier

  • Traffic Study, Analysis and Projection

  • Fixing of new alignment for the proposed Bypass

  • Modification of the alignment according to Land Acquisition

  • Geometric Design using latest highway design software

  • Fixing of CD location through ditch profile analysis

  • Design of longitudinal Drainage profile

  • Generation of cross section at 50m interval

  • Quantification of Highway components as a software output

  • Preparation of Detailed Project Report

  • Preparation of Good For Construction Drawings

Pre-bid Engineering for Section of NH-8: Varuch - Surat Under BOT Sheme

Pre-bid Engineering for Section of NH-8: Varuch - Surat Under BOT
Sheme

 

Country: India

Project Location within country:
Gujrat

Professional Senior Staff Provided

  • No. of Staff                            4

  • No. of person-months           8

Name of Client

Electrosteel Infrastructure Services, Kolkata

__________________________________________________________________________________________

Start Date (mo/yr)                   June 2005

Completion Date (mo/yr)          July 2005

Approx. Value of firm's Service

INR 500,000

__________________________________________________________________________________________

Name of Associated Firms

Man Months of Professional Staff Provided by Associated Firm – Nil

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam              Highway Designer

R Chowdhury         Bridge Engineer

A Jain                    Tranportation Planner

S Chakravorty       Quantity Surveyor

__________________________________________________________________________________________

Detailed Narrative Description of Project

The traffic volumes and demand for road transport in India particularly the National Highways were witnessing high growth rates. Envisaging this upward trend in the future years, Ministry of Surface Transport has entrusted the implementation of NHDP corridor on NHAI. The NAHI has taken up the existing four-lane corridor for converting it to 6-lane configuration. Pricipally the improvement of these corridors has been proposed to be implemented through NHAI under financial format of BOT basis.

__________________________________________________________________________________________

Description of Services Provided

  • Conduct traffic volume count and OD survey

  • Anlysis and Projection of future traffic

  • Optimization of proposed road design

  • Optimization of Proposed Structures

  • Quantification and optimized costing

  • Develop financial modeling for risk analysis

  • Modeling for Grant Requirement Vs. Viability

Preparation of Detailed Project Report for 2/4-lane Bypass around Ambikapur

 

Preparation of Detailed Project Report for 2/4-lane Bypass around Ambikapur

 

Country: India

Project Location within country:

Chhattisgarh           

Professionals Senior Staff Provided:

  • No. of Staff :                          6

  • No. of person-months :         32

Name of Client

R & B Department of Chhattisgarh, MOSRT&H

__________________________________________________________________________________________

Start Date (mo/yr)                  

Feb 2006
Completion Date (mo/yr)
Jan 2007
Approx. Value of firm's Services

INR 650,000

__________________________________________________________________________________________

Name of Associated Firms            

Man Months of Professional Staff Provided by Associated Firm – Vishwa Surveying Pvt. Ltd. New Delhi

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam             Alignment Specialist

Ranajit Jana          Highway Engineer

R Chowdhury        Bridge Engineer

S Chakravorty       Quantity Surveyor

D S Yadav             Geo-tech/ material Expart

Sudin Dasgupta    Draughtsman

______________________________________________________________________________

Detailed Narrative Description of Project

Amikapur town is a small urban centre in the state of Chhattisgarh and located on NH-78. In order to segregate traffic movements the R&B dept. of Chhattishgarh, proposed the construction of a 21 km 2/4-Lane divided bypass outside Ambikapurtown.

The work involved fixation of the approprite alignment after studying the topographic details, growth of the town, traffic flow etc. This has benn done in consultation with local officers of the department and other agencies like Municipality of Ambikapur. A comprehensive alignment design has been done based on the elaborate study conducted. The assignment includes selection of alignment, Traffic Study and Analysis, prepation of Highway and Structural Drawings, Rate Analysis, preparation of BOQ and Costing.

__________________________________________________________________________________________

Description of Services Provided

  • Review of deapartmental suggestion concived earlier

  • Traffic Study, Analysis and Projection

  • Fixing of new alignment for the proposed Bypass

  • Modification of the alignment according to Land Acquisition

  • Geometric Design using latest highway design software

  • Fixing of CD location through ditch profile analysis

  • Design of longitudinal Drainage profile

  • Generation of cross section at 50m interval

  • Quantification of Highway components as a software output

  • Preparation of Detailed Project Report

  • Preparation of Good For Construction Drawings

Pre-bid Engineering for Panipath BOT Project on NH-1

Pre-bid Engineering for Panipath BOT Project on NH-1

NH-1

Country: India

Project Location within country:
Uttar Pradesh          

Professional Senior Staff Provided

  • No. of Staff                           4

  • No. of person-months           4

Name of Client

Progressive Constructions Ltd. Gurgaon

__________________________________________________________________________________________

Start Date (mo/yr)                   March 2005

Completion Date (mo/yr)          April 2005

Approx. Value of firm's Service

INR 500,000

__________________________________________________________________________________________

Name of Associated Firms

Man Months of Professional Staff Provided by Associated Firm – Nil

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam               Highway Designer

R Chowdhury          Bridge Engineer

A Jain                     Tranportation Planner

M Anand                 Quantity Surveyor

__________________________________________________________________________________________

Detailed Narrative Description of Project

The traffic volumes and demand for road transport in India particularly the National Highways were witnessing high growth rates. Envisaging this upward trend in the future years, Ministry of Surface Transport, after taking up the NHDP corridor, another 10000 Km has also been taken up for implement under the scheme of non-NHDP corridor. Pricipally the improvement of these corridors has been proposed to be implemented through NHAI under financial format of BOT basis.

__________________________________________________________________________________________

Description of Services Provided

  • Conduct traffic volume count

  • Conduct OD survey

  • Traffic analysis for future projection

  • Optimization of proposed elevated corridor

  • Quantification

  • Develop financial modeling

 

Pre-bid Engineering of Meerut - Muzaffar Nagar Section of NH-58 under BOT scheme

 

Pre-bid Engineering of Meerut - Muzaffar Nagar Section of NH-58 under BOT
schemeNH-58

 

Country: India

Project Location within country:
Uttar Pradesh          

Professional Senior Staff Provided

  • No. of Staff                           3

  • No. of person-months           3

Name of Client

Nagarjuna Constructions Company. Gurgaon

__________________________________________________________________________________________

Start Date (mo/yr)                   June 2004

Completion Date (mo/yr)          July 2004

Approx. Value of firm's Service

INR 350,000

__________________________________________________________________________________________

Name of Associated Firms

Man Months of Professional Staff Provided by Associated Firm – Nil

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam              Highway Designer

A Jain                    Tranportation Planner

M Anand                Quantity Surveyor

__________________________________________________________________________________________

Detailed Narrative  Description of Project

The traffic volumes and demand for road transport in India particularly the National Highways were witnessing high growth rates. Envisaging this upward trend in the future years, Ministry of Surface Transport, after taking up the NHDP corridor, another 10000 Km has also been taken up for implement under non the scheme of non NHDP corridor. Pricipally the improvement of these corridors has been proposed to be implemented through NHAI under financial format of BOT basis.

__________________________________________________________________________________________

Description of Services Provided

  • Conduct traffic volume count

  • Conduct OD survey

  • Traffic analysis for future projection

  • Develop financial modeling

Survey,Design and Preparation of Construction Drawings for 6-lane Divided Link Road between Old-NH-8

 

Survey, Design and Preparation of Construction Drawings for 6-lane Divided
Link Roadbetween Old-NH-8 and New NH-8

Country: India

Project Location within country:
Delhi            

Professional Senior Staff Provided

  • No. of Staff                            3

  • No. of person-months           2

Name of Client

Delhi Development Authority

__________________________________________________________________________________________

Start Date (mo/yr)                   June 2002

Completion Date (mo/yr)          July 2002

Approx. Value of firm's Service

INR 100,000

__________________________________________________________________________________________

Name of Associated Firms

Man Months of Professional Staff Provided by Associated Firm – Nil

__________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam            Highway Designer

M Anand              Quantity Surveyor

Y Raju                 Draughtsman

__________________________________________________________________________________________

Detailed Narrative Description of Project

The traffic volumes and demand for road transport in India particularly the National Highways were
witnessing high growth rates. Envisaging this upward trend in the future years, The local Govt. of
Delhi has also initiated to develop/improve the existing as well as new 6-lane divided connectors to
cope up with the existing demand. This missing link was identified as a priority corridor to serve
as connector between Old and new NH-8 for an organised movement of traffice flows.

__________________________________________________________________________________________

Description of Services Provided

  • Preparation of GFC drawings

  • Preparation layout plan

  • Development of typical cross sections

  • Design of pavement

  • Quantification

Up-gradation of Rymbai - Ipmala Suchen Road, Meghalaya (Under LNCPR)

Up-gradation of Rymbai – Ipmala – Suchen Road, Meghalaya (Under LNCPR)

Country: India

Project Location within country: Meghalaya               

Professional Staff Provided:

  • No. of Staff : 4

  • No. of  person-months : 10

Name of Client

Public Works Department, Government of Meghalaya

__________________________________________________________________________________________

Start Date (mo/yr)                  

February 2005
Completion Date (mo/yr)
Appril 2005    

Approx Value of firm's Services

INR 4,50,000

__________________________________________________________________________________________

Name of Associated Firms    

Man Months of Professional Staff Provided by Associated Firm  - Nil

__________________________________________________________________________________________

Senior Staff involved and Functions Performed

B Arindam              Highway Designer                           

S Chakravorty       Quantity Surveyor

Y Raju                   Draughtsman

Abhishek               Draughtsman

__________________________________________________________________________________________

Detailed Narrative Description of Project

The upgradation project of state highways initiated by the Government of Meghalaya includes
Rymbai – Ipmala – Suchen Road. The avove section of the state highway (Km 0.000 – Km 17.000) is a major connectivity in
that region and playing important role for the economic development of the state. The existing single lane was proposed to be converted into a 2-lane road with better geometry for a design speed of atlest 40 kmph in the rugged hill.

__________________________________________________________________________________________

Description of Services Provide

  • Review of geometric alignment of the existing state highway.

  • Geometric Design using latest highway design software.

  • Improvement of existing centre line and profile.

  • Realignment in location of new Bridges.

  • Design of longitudinal Drainage profile.

  • Location identification of earth retaing structure.

  • Generation of cross section at 50m interval.

  • Quantification of Highway components as a software output.

  • Preparation of Detailed Project Report

Planning, Design and Preparation of Construction Drawings for Pharma City at Visakhapattanam.

Planning, Design and Preparation of Construction Drawings for Pharma City at
Visakhapattanam

Country: India
Project Location within country:
Maharashtra
Professionals Senior Staff Provided:
             • No. of Staff : 6
             • No. of person-months : 18
 
Name of Client
 
RPCIL
Ramky Infra Consulting Limited
______________________________________________________________________________
 
Start Date (mo/yr)
Phase I March 2004
Phase II July 2004
Completion Date (mo/yr)
Phase I June 2004
Phase II Jan 2005
______________________________________________________________________________
Approx. Value of firm's Services
INR 500,000
______________________________________________________________________________
Name of Associated Firms
Man Months of Professional Staff Provided by Associated Firm - Nil
______________________________________________________________________________
 
Senior Staff involved and Functions Performed
 
B Arindam               Highway Designer
R Chowdhury          Bridge Engineer
A Jain                      Planner
S Chakravorty         Quantity Surveyor
Y Raju                     Draughtsman
Abhishek                 Draughtsman
__________________________________________________________________________________________
 
Detailed Narrative Description of Project
 
The Govt. of of Andhara Pradesh has decided to develop some designated areas for
specific industrial base on demand through private participation. For the purpose of
such development Govt. of of Andhara Pradesh has identified 590 hecter land at
Golawada near Visaz for the development of pharmaceutical industries. The
responsibility of the development has been bestowed on Ramky Phamacity (India)
Limited for implementation under the supervision of RPCIL. The project has been
proposed to be operated under a financial format of BOT basis.
__________________________________________________________________________________________
 
Description of Services Provided
 
  •  Road network planning in accordance with the salable plot sizes
  •  Layout plan and Fixation of center line
  •  Development of typical cross sections
  •  Fixation of ROW for roads accommodating varrious utility lines
  •  Design of pavement
  •  Preparation of GFC drawings
  •  Requirement identification and design of cross drainage structure
  •  Strengthening of existing corridor passes through the area.
  •  Quantification
  •  Preparation of report.
  •  Preparation of BID document.
ge-cafe-e-side-by-side-refrigerator-2.jpg
 
Caritas Infra Consulting Private Limited
Plot no.: 1360, Sector 37, Faridabad
Haryana 121 003
Ph/Fax: +91-129-412 8517
Home | About us | Projects | Services | Contact us

Design & Developed by: Intigate(accelerating innovation)