  • Name of Client: New Okhla Industrial Development Authority Administrative Complex
  • Project Address: Sector 6, Noida – 201301, GautamBudh Nagar Uttar Pradesh, India
  • Total Length(Km): 8.0
  • Cost of Consultancy (IN/$): ₹ Rs. 1,200,000 $ 20,000
  • Start Date: Nov 2010
  • Completion Date : Mar 2010
  • Name of the Key persons Deployed
    • AK Mohinta
    • Suresh
    • Sambit

  • Brief Scope of Work:
  • Detail design of Swage line including Treatment Plant nad waste water management.

  • Name of Client: Shristi Infrastructures Development Corporation Ltd.
  • Project Address: Shristi Infrastructures Development Corporation Ltd.
  • Total Length(Km): 20.85
  • Cost of Consultancy (IN/$): ₹ Rs. 400,000 $ 6,666.67
  • Start Date: Jul 2007
  • Completion Date : Sept 2007
  • Name of the Key persons Deployed
    • Arindam B
    • Prabhat Biswas

  • Brief Scope of Work:
  • Joint inspection of the road, Preparation of construction cross sections and reconciliation of 15 RA bills for final negotiation and settlement.

  • Name of Client: Technofab Engineering Ltd.
  • Project Address: Technofab House Plot 5, Sec 27C Mathura Road Fbd – 122 003, Haryana, India
  • Total Length(Km): --
  • Cost of Consultancy (IN/$): ₹ Rs. 100,000 $ 1,666.67
  • Start Date: Mar 2010
  • Completion Date : Oct 2010
  • Name of the Key persons Deployed
    • Debjit Gupta
    • Subrata Dey

  • Brief Scope of Work:
  • Structural Design of Common sewage collection, Centralised Sewage Collection Pit, Aeration tank, Sludge drawing bed

  • Name of Client: Technofab Engineering Ltd.
  • Project Address: Technofab House Plot 5, Sec 27C Mathura Road Fbd – 122 003, Haryana, India
  • Total Length(Km): --
  • Cost of Consultancy (IN/$): ₹ Rs. 350,000 $ 5,833.33
  • Start Date: Mar 2010
  • Completion Date : Nov 2010
  • Name of the Key persons Deployed
    • Debjit Gupta
    • Subrata Dey

  • Brief Scope of Work:
  • Structural Design of Coal Pile area run off settling pond including inlet and outlet channel, Over flow sump, Oily waste water sump for GT area and Fuel Oil area , API separator, CMB ,

  • Name of Client: Technofab Engineering Ltd.
  • Project Address: Technofab House Plot 5, Sec 27C Mathura Road Fbd – 122 003, Haryana, India
  • Total Length(Km): --
  • Cost of Consultancy (IN/$): ₹ Rs. 550,000 $ 9,166.67
  • Start Date: Mar 2010
  • Completion Date : Oct 2010
  • Name of the Key persons Deployed
    • Debjit Gupta
    • A Mukherjee

  • Brief Scope of Work:
  • Structural Design of HRSG Blow Down Sump, Burnt Oil Pit, STG and CTG Area oily waste collection pit, Common Collection Pit, Lamella Sludge Collection Pit , Oil Separator foundation, Guard Pond, Flash Mixer flocculator and tube settler, Centralised Sewage collection pit, Aeration Tank

  • Name of Client: Technofab Engineering Ltd.
  • Project Address: Technofab House Plot 5, Sec 27C Mathura Road Fbd – 122 003, Haryana, India
  • Total Length(Km): --
  • Cost of Consultancy (IN/$): ₹ Rs. 300,000 $ 5000
  • Start Date: May 2009
  • Completion Date : Oct 2009
  • Name of the Key persons Deployed
    • Debjit Gupta
    • Subrata Dey

  • Brief Scope of Work:
  • Structural Design of Sumps along with the Pump House 21m x 30m. Pressure Sand Filter (PSF) and pumps foundations etc.

  • Name of Client: Design of Water Treatment Plant at 2x125 MW Surat Lignite Power Project.
  • Project Address: Technofab House Plot 5, Sec 27C Mathura Road Fbd – 122 003, Haryana, India
  • Total Length(Km): --
  • Cost of Consultancy (IN/$): ₹ Rs. 350,000 $ 5,833.33
  • Start Date: May 2009
  • Completion Date : Oct 2009
  • Name of the Key persons Deployed
    • Debjit Gupta
    • A Mukherjee

  • Brief Scope of Work:
  • Structural Design of Water Treatment Plant components like Guard Pond, Chemical House, Oil Separator, Various Sumps & pump houses.

  • Name of Client: PWD, Nagaland
  • Project Address: 29, Aurangzeb Road, New Delhi India
  • Total Length(Km): 32.5
  • Cost of Consultancy (IN/$): ₹ Rs. 500,000 $ 8,333.33
  • Start Date: Jan 2008
  • Completion Date : Mar 2008
  • Name of the Key persons Deployed
    • Arindam B
    • Prabhat Biswas
    • R Chowdhury

  • Brief Scope of Work:
  • Detailed engineering, design of 2-lane hill road including cross drainage structures.

  • Name of Client: SREI/ LEA
  • Project Address: E27/B1 MCIE Mathura Road New Delhi, India
  • Total Length(Km): 116.6
  • Cost of Consultancy (IN/$): ₹ Rs. 820,000 $ 13,666.67
  • Start Date: Nov 2009
  • Completion Date : Feb 2010
  • Name of the Key persons Deployed
    • Arindam B
    • Akshat Jain

  • Brief Scope of Work:
  • Traffic and engineering surveys, Traffic projection, generation of Toll.

  • Name of Client: DS Constructions Ltd
  • Project Address: New Delhi, India
  • Total Length(Km): 85
  • Cost of Consultancy (IN/$): ₹ Rs. 350,000 $ 5,833.33
  • Start Date: Nov 2004
  • Completion Date : Jan 2005
  • Name of the Key persons Deployed
    • Akshat Jain

  • Brief Scope of Work:
  • Pre-bid Engineering and evaluation of Raipur - Arang Section of NH-6 under BOT scheme of Non - NHDP Corridors.

  • Name of Client: Nagarjuna Constructions Ltd
  • Project Address: 9th Floor, Jmd Regent Square, Dlf Qutab Enclave, Phase-II, Dlf Qutab Enclave, Gurgaon, Haryana 122002 India
  • Total Length(Km): 100
  • Cost of Consultancy (IN/$): ₹ Rs. 350,000 $ 5,833.33
  • Start Date: June 2007
  • Completion Date : July 2007
  • Name of the Key persons Deployed
    • Akshat Jain
    • Arindam B
    • M Anand

  • Brief Scope of Work:
  • Pre-bid Engineering and evaluation of Meerut - Muzaffar Nagar Section of NH-58 under BOT scheme of Non - NHDP Corridors in Uttar Pradesh, India.

  • Name of Client: Electro Steel
  • Project Address: 13, Dr U N Brahmachari Sarani, Park Street, Park Street, Kolkata – India
  • Total Length(Km): 165
  • Cost of Consultancy (IN/$): ₹ Rs. 380,000 $ 6,333.33
  • Start Date: Aug 2004
  • Completion Date : Sep 2004
  • Name of the Key persons Deployed
    • Rakesh Chowdhury
    • Arindam B
    • Akshat Jain

  • Brief Scope of Work:
  • Pre-bid Engineering of Vadodara – Bharuch Section of NH 8 proposed to be taken up on B.O.T Basic in Gujarat, India.

  • Name of Client: Progressive Constructions Ltd
  • Project Address: 18 Kotla lane Rouse Avenue New Delhi. India
  • Total Length(Km): 10
  • Cost of Consultancy (IN/$): ₹ Rs. 1,000,000 $ 16,666.67
  • Start Date: March 2007
  • Completion Date : April 2007
  • Name of the Key persons Deployed
    • Rakesh Chowdhury
    • Arindam B
    • Akshat Jain
    • M Anand

  • Brief Scope of Work:
  • Preliminary Design of Structure, Costing and Traffic and engineering surveys, Traffic projection, generation of Toll and Development of Financial Model.

  • Name of Client: Progressive Constructions Ltd.
  • Project Address: 18 Kotla Lane Rouse Avenue, New Delhi, India
  • Total Length(Km): 40
  • Cost of Consultancy (IN/$): ₹ Rs. 450,000 $ 7,500
  • Start Date: Nov 2007
  • Completion Date : Dec 2007
  • Name of the Key persons Deployed
    • Akshat Jain
    • Arindam B

  • Brief Scope of Work:
  • Traffic and engineering surveys, Traffic projection, generation of Toll and Development of Financial Model.

  • Name of Client: Progressive Constructions Ltd.,
  • Project Address: 18 Kotla Lane Rouse Avenue, New Delhi, India
  • Total Length(Km): 175
  • Cost of Consultancy (IN/$): ₹ Rs. 500,000 $ 8,333.33
  • Start Date: June 2007
  • Completion Date : July 2007
  • Name of the Key persons Deployed
    • Akshat Jain
    • Arindam B
    • R Choudhury
    • S Chakroborty

  • Brief Scope of Work:
  • Traffic and engineering surveys, Traffic projection, generation of Toll and Development of Financial Model.

  • Name of Client: SYSTRA MVA Consulting (India) Pvt Ltd(SYSTRA/RELIANCE ENERGY)
  • Project Address: Guru Angad Bhawan, 71 Nehru Place, New Delhi 110019,India
  • Total Length(Km): 22.6
  • Cost of Consultancy (IN/$): ₹ Rs. 675,000 $ 11,250
  • Start Date: Oct 2007
  • Completion Date : Dec 2007
  • Name of the Key persons Deployed
    • Arindam B
    • A Jain
    • Prabhat Biswas
    • Vinod Nagrecha
    • Praveen Joshi
    • S Thakur

  • Brief Scope of Work:
  • Value engineering through Re-profiling the entire corridor. Review of interchanges, develop cross section, report on environmental issues, complete ITS architecture and electrification design, design of Toll Plaza incl. its Office Plaza, Bird Observatory, rescue center preparation of cost and specifications.

  • Name of Client: DLF-WSP
  • Project Address: 19th Floor Tower C, Cyber Greens, Gurgaon India
  • Total Length(Km): 1040
  • Cost of Consultancy (IN/$): ₹ Rs. 1,350,000 $ 22,500
  • Start Date: Dec 2007
  • Completion Date : Jan 2008
  • Name of the Key persons Deployed
    • Arindam B
    • C D Singh
    • Prabhat Biswas
    • Akshat Jain

  • Brief Scope of Work:
  • Pre-bid engineering, preliminary costing, preparation of typical drawings.

  • Name of Client: Isolux-Soma Consortium/LASA
  • Project Address: E27/B1 MCIE Mathura Road, New Delhi, India
  • Total Length(Km): 125
  • Cost of Consultancy (IN/$): ₹ Rs. 2,100,000 $ 35,000
  • Start Date: Oct 2008
  • Completion Date : Nov 2008
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Prabhat Biswas
    • Akshat Jain

  • Brief Scope of Work:
  • Traffic and engineering surveys, Traffic projection, generation of Toll, Preliminary design of Roads and Structures, GPS routing, rate analysis, BOQ, costing

  • Name of Client: Isolux-Soma Consortium/LASA
  • Project Address: E27/B1 MCIE Mathura Road, New Delhi, India ND - 110 044
  • Total Length(Km): 165
  • Cost of Consultancy (IN/$): ₹ Rs. 2,100,000 $ 35,000
  • Start Date: Oct 2008
  • Completion Date : Nov 2008
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Prabhat Biswas
    • Akshat Jain

  • Brief Scope of Work:
  • Traffic and engineering surveys, Traffic projection, generation of Toll, Preliminary design of Roads and Structures, GPS routing, rate analysis, BOQ, costing

  • Name of Client: Lea Associates South Asia Pvt. Ltd.
  • Project Address: E27/B1 MCIE Mathura Road, New Delhi, India
  • Total Length(Km): 55
  • Cost of Consultancy (IN/$): ₹ Rs. 850,000 $ 14,166.67
  • Start Date: Sept 2009
  • Completion Date : Oct 2009
  • Name of the Key persons Deployed
    • Akshat Jain
    • Arun Hazra
    • Sambit Karfa

  • Brief Scope of Work:
  • Traffic and engineering surveys, Traffic projection, generation of Toll.

  • Name of Client: Shapoorji Pallonji & Co. Ltd./LASA
  • Project Address: E27/B1 MCIE Mathura Road, New Delhi, India
  • Total Length(Km): 84.5
  • Cost of Consultancy (IN/$): ₹ Rs. 750,000 $ 12,500
  • Start Date: Oct 2009
  • Completion Date : Nov 2009
  • Name of the Key persons Deployed
    • Akshat Jain
    • Dev Kumar

  • Brief Scope of Work:
  • Traffic and engineering surveys, Traffic projection, generation of Toll.

  • Name of Client: Isolux-Soma Consortium/LASA
  • Project Address: E27/B1 MCIE Mathura Road, New Delhi, India ND - 110 044
  • Total Length(Km): 170.35
  • Cost of Consultancy (IN/$): ₹ Rs. 910,000 $ 15,166.67
  • Start Date: Oct 2009
  • Completion Date : Nov 2009
  • Name of the Key persons Deployed
    • Akshat Jain
    • Arun Hazra
    • Sambit Karfa

  • Brief Scope of Work:
  • Traffic and engineering surveys, Traffic projection, generation of Toll.

  • Name of Client: GMR Group
  • Project Address: IBC Knowledge Park, Phase 2, "D" Block,9th Floor,4/1, BannerghattaRoad, Bangalore-560029,Karnataka, India
  • Total Length(Km): 555
  • Cost of Consultancy (IN/$): ₹ Rs. 5,000,000 $ 83,333.33
  • Start Date: Jun 2011
  • Completion Date : Jul 2011
  • Name of the Key persons Deployed
    • Arindam B
    • Sudipta Dey
    • S Chatterjee
    • A jain
    • Biraj Mondal

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures including R.O.B. along the existing alignment and finalization of widening scheme, costing and preparation of bid document.

  • Name of Client: Piramal Roads Infra Ltd
  • Project Address: 2, Peninsual Spenta Mathuradas Mills Senapati Bapat Marg Lower Parel-Mumbai – 400013
  • Total Length(Km): 165
  • Cost of Consultancy (IN/$): ₹ Rs. 1,500,000 $ 25,000
  • Start Date: Nov 2011
  • Completion Date : Dec 2011
  • Name of the Key persons Deployed
    • S Mondal
    • K Suresh
    • S Karfa
    • L Prasad

  • Brief Scope of Work:
  • Traffic and engineering surveys, Traffic projection, generation of Toll and Financial analysis and Costing

  • Name of Client: Piramal Roads Infra Ltd
  • Project Address: 2, Peninsual Spenta Mathuradas Mills Senapati Bapat Marg Lower Parel-Mumbai – 400013
  • Total Length(Km): 100
  • Cost of Consultancy (IN/$): ₹ Rs. 2,000,000 $ 33,333.33
  • Start Date: Sep 2011
  • Completion Date : Oct 2011
  • Name of the Key persons Deployed
    • Arindam B
    • S Chatterjee
    • A jain
    • Biraj Mondal
    • S Mondal

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structure along the existing alignment and finalization of widening scheme, costing and preparation of bid document. Traffic and engineering surveys, Traffic projection, generation of Toll and Financial analysis and Costing

  • Name of Client: Essar Investments Ltd
  • Project Address: Essar House 11 K K Marg Mahalaxmi Mumbai, 400034 India
  • Total Length(Km): 104
  • Cost of Consultancy (IN/$): ₹ Rs. 2,500,000 $ 41,666.67
  • Start Date: Dec 2011
  • Completion Date : Jan 2012
  • Name of the Key persons Deployed
    • Arindam B
    • S Mondal
    • S Chatterjee
    • L Prasad

  • Brief Scope of Work:
  • Detailed engineering, location survey, study of proposed Bypass alignment, design of major and minor structure along the existing alignment including the option study for the long bridge of 3.144km across river Krishna and study the appropriateness of widening scheme, estimation of complete project and preparation of bid document. Traffic surveys and engineering surveys, Traffic projection, generation of Toll and Financial analysis for advising the viability.

  • Name of Client: Punj Lloyd Group
  • Project Address: 78 Institutional Area Sector 32 Gurgaon 122 001, India
  • Total Length(Km): 275
  • Cost of Consultancy (IN/$): ₹ Rs. 25,00,000 $ 41,666.67
  • Start Date: Mar 2013
  • Completion Date : Apr 2013
  • Name of the Key persons Deployed
    • A Bhattacharya
    • S Mondal
    • S Karfa

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Traffic survey and forecast, Axle Load Survey, Cost Estimate etc.

  • Name of Client: Supreme Infrastructure India Ltd
  • Project Address: Ecospace Business Park Action area II, Building – 2A, 5th Floor, New Town, Rajarhat, Kolkata
  • Total Length(Km): 75
  • Cost of Consultancy (IN/$): ₹ Rs. 10,00,000 $ 16,666.67
  • Start Date: Jan 2014
  • Completion Date : Feb 2014
  • Name of the Key persons Deployed
    • A Bhattacharya
    • S Mondal
    • S Karfa
    • L Prasad

  • Brief Scope of Work:
  • Detail Engineering, Traffic survey and forecast, Cost Estimate etc.

  • Name of Client: Supreme Infrastructure India Ltd.
  • Project Address: Ecospace Business Park Action area II, Building – 2A, 5th Floor, New Town, Rajarhat, Kolkata- 700156
  • Total Length(Km): 75
  • Cost of Consultancy (IN/$): ₹ Rs. 8,00,000 $ 13,333.33
  • Start Date: Feb 2014
  • Completion Date : Mar 2014
  • Name of the Key persons Deployed
    • Arindam B
    • S Mondal
    • S Chatterjee
    • L Prasad

  • Brief Scope of Work:
  • Detail Engineering, Traffic survey and forecast, Cost Estimate etc.

  • Name of Client: KSS Petron Pvt. Ltd
  • Project Address: 1st Floor, A-Wing, Vatika Tower, Sector -54, Gurgaon -122002, India
  • Total Length(Km): 96.36
  • Cost of Consultancy (IN/$): ₹ Rs. 15,00,000 $ 25,000
  • Start Date: Jan 2015
  • Completion Date : --
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Biraj Mondal
    • C K Bafna
    • Rajeev Kumar

  • Brief Scope of Work:
  • Detailed engineering, Sub Soil Investigation, Axle Load Survey, BBD Survey, Costing, preparation of BOQ, design of major and minor structures including R.O.B.along the alignment.

  • Name of Client: GKC Projects Limited
  • Project Address: Sy. No.9 ( P ) HITEC City, CII Green Building Lane, Kondapur, Hyderabad - 500084, AP, INDIA
  • Total Length(Km): 39
  • Cost of Consultancy (IN/$): ₹ Rs. 12,00,000 $ 20,000
  • Start Date: Dec 2014
  • Completion Date : Feb 2015
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Biraj Mondal
    • C K Bafna
    • Rajeev Kumar

  • Brief Scope of Work:
  • Detailed engineering, Costing, design of major and minor structures including R.O.B. TUNNEL, along the alignment.

  • Name of Client: Sanjose India Infrastructure & Construction Pvt. Ltd.
  • Project Address: Unit 602, 6th Floor, Global Foyer Building, Golf Course Road, Sector 43 Gurgaon - 122002 Haryana
  • Total Length(Km): 51.0
  • Cost of Consultancy (IN/$): ₹ Rs. 15,35,590 $ 25,593.17
  • Start Date: Sep 2015
  • Completion Date : Oct 2015
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • S mondal
    • C K Bafna
    • Rajeev Kumar

  • Brief Scope of Work:
  • Detailed engineering, Sub Soil Investigation, Axle Load Survey, BBD Survey, Costing, preparation of BOQ, design of major and minor structures including R.O.B. along the alignment.

  • Name of Client: Sanjose India Infrastructure & Construction Pvt. Ltd
  • Project Address: Unit 602, 6th Floor, Global Foyer Building, Golf Course Road, Sector 43 Gurgaon - 122002 Haryana, India
  • Total Length(Km): 80.6
  • Cost of Consultancy (IN/$): ₹ Rs. 15,35,590 $ 25,593.17
  • Start Date: Sep 2015
  • Completion Date : Oct 2015
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • S mondal
    • C K Bafna
    • Rajeev Kumar

  • Brief Scope of Work:
  • Detailed engineering, Sub Soil Investigation, Axle Load Survey, BBD Survey, Costing, preparation of BOQ, design of major and minor structures including R.O.B. along the alignment.

  • Name of Client: IRCON INTERNATIONAL LIMITED
  • Project Address: C-4, District Center, Saket New Delhi - 110017
  • Total Length(Km): 86.4
  • Cost of Consultancy (IN/$): ₹ Rs. 15,01,130 $ 25,018.83
  • Start Date: Feb 2015
  • Completion Date : Mar 2015
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • S mondl
    • C K Bafna
    • Rajeev Kumar

  • Brief Scope of Work:
  • Detailed engineering, Sub Soil Investigation, Axle Load Survey, BBD Survey, Costing, preparation of BOQ, design of major and minor structures including R.O.B.along the alignment.

  • Name of Client: CONSTRUCTORA SANJOSE S.A
  • Project Address: Unit 602, 6 th Floor, Global Foyer Building, Golf Course Road, Sector 43 Gurgaon – 122002 Haryana.
  • Total Length(Km): 22
  • Cost of Consultancy (IN/$): ₹ Rs. 16,60,000/- $ 23,700
  • Start Date: Nov 2018
  • Completion Date : Jan 2019
  • Name of the Key persons Deployed
    • Arindam B
    • Subodh Thakur
    • S Majhi
    • S Chakraborty

  • Brief Scope of Work:
  • Site visit, inventories, study of RFP, topo survey of the alignment, preparation of Preliminary GAD, identification of bottleneck if any, Borrow Area and quarries identification, CBR confirmation test, Quantifications.

  • Name of Client: MOST/LASA
  • Project Address: Lea Associate South Asia (LASA), New Delhi
  • Total Length(Km): 77
  • Cost of Consultancy (IN/$): ₹ Rs. 12,000,000 $ 200,000
  • Start Date: Sept 2010
  • Completion Date : Ongoing
  • Name of the Key persons Deployed
    • Col A Madan
    • S M Ghosh
    • A Bhattacharya
    • S Chatterjee
    • R D Sharma
    • Subhas Nigam
    • S Verma
    • Madhusudan

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures along the existing alignment and finalization of widening scheme, costing and preparation of bid document. (The project involves Land Acquisition for 77 km.)

Preparation of DPR of Siliguri-Darjeeling Road (NH-55) in    West Bengal, Hill Road.India
  • Name of Client: Public Work Department Meghalaya
  • Project Address: P.W.D. (Roads), Meghalaya, Shillong-793001 India
  • Total Length(Km): 22
  • Cost of Consultancy (IN/$): ₹ Rs. 2,500,000 $ 35714.29
  • Start Date: May 2009
  • Completion Date : Jan 2010
  • Name of the Key persons Deployed
    • A Jain
    • Prabhat Biswas
    • C D Singh
    • S Verma
    • Arindam B
    • R D Sharma
    • Subhas Nigam

  • Brief Scope of Work:
  • Detailed engineering, location survey, design of major and minor structures along the existing alignment and finalization of widening scheme, costing and preparation of bid document.

Detailed Project Report for RSN Road at William Nagar in Meghalaya, India. 22km
  • Name of Client: Public Work Department Meghalaya
  • Project Address: P.W.D. (Roads), Meghalaya, Shillong-793001 India
  • Total Length(Km): 83
  • Cost of Consultancy (IN/$): ₹ Rs. 4,800,000 $ 68571.43
  • Start Date: Sept 2009
  • Completion Date : Jan 2010
  • Name of the Key persons Deployed
    • A Jain
    • Prabhat Biswas
    • C D Singh
    • S Verma
    • Arindam B
    • R D Sharma
    • Subhas Nigam

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures along the existing alignment and finalization of widening scheme, costing and preparation of bid document.

Detailed Project Report for Shillong – Nongstoin, NH 44E in Meghalaya, India. 83km
  • Name of Client: Public Work Department, Rajasthan
  • Project Address: Jacob Road, Civil Lines, Jaipur.-01 India
  • Total Length(Km): 70
  • Cost of Consultancy (IN/$): ₹ Rs. 1,750,000 $ 29,166.67
  • Start Date: Feb 2010
  • Completion Date : Dec 2010
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Prabhat Biswas
    • Biraj Mondal
    • Akshat Jain

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures along the existing alignment and finalization of widening scheme, costing and preparation of bid document. (The project involves Land Acquisition for 70 km.)

  • Name of Client: NHAI/LASA
  • Project Address: B-1, E-27, Mohan Cooperative Industrial Estate Mathura Road New Delhi-110044
  • Total Length(Km): 84.1
  • Cost of Consultancy (IN/$): ₹ Rs. 65,00,000 $ 92857.14
  • Start Date: Oct 2016
  • Completion Date : May 2017
  • Name of the Key persons Deployed
    • Arindam B
    • P Hazra
    • B N Mukherjee
    • Biraj Mondal
    • C K Bafna
    • S Mondal

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures along the existing alignment and finalization of widening scheme, Traffic survey and forecast, costing and preparation of bid document.

  • Name of Client: DDA Delhi
  • Project Address: Vikas Sadan, New Delhi-110023
  • Total Length(Km): 4
  • Cost of Consultancy (IN/$): ₹ Rs. 450,000 $ 7,500
  • Start Date: Jul 2000
  • Completion Date : Nov 2000
  • Name of the Key persons Deployed
    • Arindam B
    • Prabhat Biswas
    • Ranajeet Jana

  • Brief Scope of Work:
  • Detailed engineering, design of 2 lane road including structures.

  • Name of Client: Public Work Department
  • Project Address: 7th Floor Konkan Bhavan Navi Mumbai Pin - 400614
  • Total Length(Km): 12
  • Cost of Consultancy (IN/$): ₹ Rs. 550,000 $ 9,166.67
  • Start Date: Feb 2001
  • Completion Date : Apr 2001
  • Name of the Key persons Deployed
    • Arindam B
    • Akshat Jain
    • Prabhat Biswas

  • Brief Scope of Work:
  • Detailed engineering, design of 2 lane road including structures.

  • Name of Client: Ramky Infra Consulting Pvt. Ltd.
  • Project Address: C-11b,Super Mart I,Phase IV,Dlf, Gurgaon, India-122011
  • Total Length(Km): 56
  • Cost of Consultancy (IN/$): ₹ Rs. 550,000 $ 9,166.67
  • Start Date: Dec 2002
  • Completion Date : Dec 2002
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Akshat Jain

  • Brief Scope of Work:
  • Detailed engineering, design of 2 lane road including structures..

  • Name of Client: Public Work Department
  • Project Address: P.W.D. (Roads), Meghalaya, Shillong-793001 India
  • Total Length(Km): 17
  • Cost of Consultancy (IN/$): ₹ Rs. 850,000 $ 14,166.67
  • Start Date: Jan 2004
  • Completion Date : Apr 2004
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Akshat Jain

  • Brief Scope of Work:
  • Detailed engineering, design of 2 lane road including structures.

  • Name of Client: Public Work Department
  • Project Address: P.W.D. (Roads), Meghalaya, Shillong-793001 India
  • Total Length(Km): 25
  • Cost of Consultancy (IN/$): ₹ Rs. 1,200,000 $ 20,000
  • Start Date: Aug 2005
  • Completion Date : Nov 2005
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Akshat Jain

  • Brief Scope of Work:
  • Detailed engineering, design of 2 lane road including structures.

  • Name of Client: Public Work Department Chhattisgarh
  • Project Address: The Superintending Engineer National Highway Circle, P.W.D., N.H. Campus Behind Holy Cross School Pensionbada, Raipur (Chhattisgarh)
  • Total Length(Km): 12
  • Cost of Consultancy (IN/$): ₹ Rs. 950,000 $ 15,833.33
  • Start Date: May 2007
  • Completion Date : Sep 2007
  • Name of the Key persons Deployed
    • Arindam B
    • Ranajit Jana
    • R Chowdhury
    • S Chakrovorty
    • D S Yadav
    • Sudin Dasgupta

  • Brief Scope of Work:
  • Detailed engineering, design of 2 lane road including structures.

Name of the Project Detailed Engineering Preparation of Detailed Project Report of Indo-Nepal Border Road in Bihar, India (MHA, GOI Pkg-4) of 178km, 2lane with Paved shoulder.  Preparation of Detailed Project Report for Rehabilitation and up-gradation of NH-43 from Km 130.000 to km 180.000 (Kanker to Bedma section) to two lane with paved shoulder in the state of Chhattisgarh under NHDP-IV through EPC basis. Detailed Survey of Road, Shiver Network, Underground Water Pipe Line etc. for Faridabad Smart City Pr
  • Name of Client: Forest Department
  • Project Address: 22/C Dehradun, Uttaranchal,India EPIL (Nodal Agency)
  • Total Length(Km): 200
  • Cost of Consultancy (IN/$): ₹ Rs. 950,000 $ 15,833.33
  • Start Date: Jan 2007
  • Completion Date : June 2007
  • Name of the Key persons Deployed
    • Arindam B
    • Prabhat Biswas
    • Ranajeet Jana
    • R Choudhury

  • Brief Scope of Work:
  • Detailed engineering, design of Single-lane hill road including cross drainage structures.

  • Name of Client: SMEC
  • Project Address: 5th Floor Tower C, DLF Building No 8, DLF Cyber City Ph-II, Gurgaon, India
  • Total Length(Km): 66
  • Cost of Consultancy (IN/$): ₹ Rs. 2,700,000 $ 45,000
  • Start Date: Dec 2006
  • Completion Date : August 2007
  • Name of the Key persons Deployed
    • Arindam B
    • Ranajit Jana
    • Sanjay Chatterjee
    • Prabhat Biswas

  • Brief Scope of Work:
  • Detailed engineering, design of road including the intersections.

Detailed geometric design of Banher – Maharashtra Border, SH 31, in Madhya Pradesh, India.
  • Name of Client: SMEC
  • Project Address: 5th Floor Tower C, DLF Building No 8, DLF Cyber City Ph-II, Gurgaon, India
  • Total Length(Km): 75
  • Cost of Consultancy (IN/$): ₹ Rs. 2,700,000 $ 45,000
  • Start Date: Dec 2007
  • Completion Date : Nov 2008
  • Name of the Key persons Deployed
    • Arindam B
    • Ranajit Jana
    • Sanjay Chatterjee
    • Prabhat Biswas

  • Brief Scope of Work:
  • Detailed engineering, design of road including the intersections.

Detailed geometric design of Khandwa – Khargon, SH 26, in Madhya Pradesh, India
  • Name of Client: WAPCOS/ Explorer
  • Project Address: Haryana
  • Total Length(Km): 140 nos.
  • Cost of Consultancy (IN/$): ₹ Rs. 1,050,000 $ 17,500
  • Start Date: May 2007
  • Completion Date : Jan 2008
  • Name of the Key persons Deployed
    • Arindam B
    • Sanjay Chatterjee
    • Prabhat Biswas
    • N P Dutta

  • Brief Scope of Work:
  • Detailed engineering, location survey, design of approach road including four major bridges.

  • Name of Client: Tantia Constructions Ltd.
  • Project Address: DD-30, sector 1, Saltlake City, Kolkata- 64, INDIA
  • Total Length(Km): 10
  • Cost of Consultancy (IN/$): ₹ ` Rs. 850,000 $ 14,166.67
  • Start Date: Nov 2007
  • Completion Date : Dec 2007
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Akshat Jain
    • Prabhat Biswas

  • Brief Scope of Work:
  • Detailed engineering, design of 4 lane road including structures.

  • Name of Client: SMEC
  • Project Address: 5th Floor Tower-C, DLF Building No 8, DLF Cyber City Ph-II, Gurgaon, India
  • Total Length(Km): 20
  • Cost of Consultancy (IN/$): ₹ Rs. 1,800,000 $ 30,000
  • Start Date: Sep 2006
  • Completion Date : Jan 2007
  • Name of the Key persons Deployed
    • Arindam B
    • Prabhat Biswas
    • Sanjay Chowdhury

  • Brief Scope of Work:
  • Detailed engineering, design of 4 lane road including road side amenities.

Preparation of Detailed engineering design of Tikri – Pokhal section from km 100 – Km 120.
  • Name of Client: SIDCL
  • Project Address: F-13 Kailash Colony, New Delhi, India
  • Total Length(Km): 20.85
  • Cost of Consultancy (IN/$): ₹ Rs. 2,800,000 $ 46,666.67
  • Start Date: Aug 2007
  • Completion Date : Dec 2007
  • Name of the Key persons Deployed
    • Arindam B
    • Prabhat Biswas

  • Brief Scope of Work:
  • Detailed engineering, design of 4 lane road including road side amenities.

  • Name of Client: PWD(NH Circle) VSTPL
  • Project Address: Public Works Department Sirpur Bhawan Raipur (CG)-492001
  • Total Length(Km): 12
  • Cost of Consultancy (IN/$): ₹ Rs. 1,800,000 $ 30000
  • Start Date: Feb 2008
  • Completion Date : Oct 2008
  • Name of the Key persons Deployed
    • Arindam B
    • Akshat Jain
    • Ranajit Jana
    • R Choudhury
    • S Chakrovorty
    • D S Yadav
    • Sudin Dasgupta

  • Brief Scope of Work:
  • Detailed engineering, design of 2 lane road Bypass including road side amenities and cross drainage.

Preparation of Detailed engineering design of Bagbahra Bypass in Chhattisgarh, India.
  • Name of Client: WAPCOS/ Explorer
  • Project Address: Haryana
  • Total Length(Km): 331
  • Cost of Consultancy (IN/$): ₹ Rs. 3,100,000 $ 51,666.67
  • Start Date: Jan 2007
  • Completion Date : Mar 2008
  • Name of the Key persons Deployed
    • Arindam B
    • Akshat Jain
    • Sanjay Chatterjee
    • Ranajit Jana
    • Prabhat Biswas

  • Brief Scope of Work:
  • Detailed engineering of 2-lane road for 360km and 4-lane for 40km, Survey, design of geometric and road side amenities, rate analysis and costing.

Preparation of Detailed Design Report for 9 selective corridors in Haryana, India.
  • Name of Client: WSP-DLF
  • Project Address: 19th Floor DLF Cyber City Gurgaon, India
  • Total Length(Km): 10
  • Cost of Consultancy (IN/$): ₹ Rs. 6,00,000 $ 10,000
  • Start Date: Mar 2009
  • Completion Date : May 2009
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • R Choudhury
    • Prabhat Biswas
    • A Jain

  • Brief Scope of Work:
  • Hydrological analysis and Drainage Design based on 100 year retention Period.

  • Name of Client: WSP-DLF
  • Project Address: 19th Floor DLF Cyber City Gurgaon, India
  • Total Length(Km): 12
  • Cost of Consultancy (IN/$): ₹ Rs. 4,800,000 $ 80,000
  • Start Date: May 2008
  • Completion Date : Sep 2008
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • R Choudhury
    • Prabhat Biswas
    • A Jain

  • Brief Scope of Work:
  • Preliminary Design of Alignment and structures includes 3 8-lane flyovers and 5 under passes to decongest the traffic from DLF tower vis Sikanderpur to DLF Golf Course-II

Preliminary Engineering for Selective Road in Gurgaon, Haryana (including 3 nos. 8 lane flyover, 1 nos. 3 lane Flyover unidirectional, Underpass: 2 nos. 8 lane, 3 nos. 4 lane).
  • Name of Client: SYSTRA MVA Consulting (India) Pvt. Ltd
  • Project Address: Guru Angad Bhawan, 71 Nehru Place, New Delhi 110019,India, Tel +91 11 2641 3310
  • Total Length(Km): 22.6
  • Cost of Consultancy (IN/$): ₹ Rs. 675,000 $ 11,250
  • Start Date: Oct 2007
  • Completion Date : Dec 2007
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Akshat Jain
    • Subhas Nigam
    • R D Sharma

  • Brief Scope of Work:
  • Value engineering through Re-profiling the entire corridor. Review of interchanges, develop cross section, report on environmental issues, complete ITS architecture and electrification design, design of Toll Plaza incl. its Office Plaza, Bird Observatory, rescue center preparation of cost and specifications.

Pre-bid engineering of Mumbai Trans Harbor Link (MTHL) in Maharashtra, India
  • Name of Client: SYSTRA/ Ministry of Public Work, Kuwait
  • Project Address: Guru Angad Bhawan, 71 Nehru Place, New Delhi 110019,India
  • Total Length(Km): 40
  • Cost of Consultancy (IN/$): ₹ Rs. 1,000,000 $ 16,666.67
  • Start Date: Jan 2011
  • Completion Date : Mar 2011
  • Name of the Key persons Deployed
    • Arindam B
    • Arnab Dey
    • Suresh Karee
    • Sourav Chatterjee

  • Brief Scope of Work:
  • Preliminary Design of Alignment for 8 lane elevated expressway and Planning and Design of 17 Industrial Building including a Visitor Center and a Auditorium. Architectural concept planning and Structural design including Plumbing, HAVC, Electrical, Fire Fighting, Landscaping of the following Buildings.

Design, Build, Completion and maintenance of Seikh Jaber Al-Ahmed Al-Sabah causeway project (Main link). 8 lane elevated expressway corridor connecting Gazli-Suwaikh-Subiah in KUWAIT (Tender no RA/140), PPP Project.
  • Name of Client: New Okhla Industrial Development Authority Administrative Complex
  • Project Address: Sector 6, Noida – 201301, Gautam Budh Nagar Uttar Pradesh, India
  • Total Length(Km): 2.0
  • Cost of Consultancy (IN/$): ₹ Rs. 2,570,000 $ 4,283.33
  • Start Date: Dec 2008
  • Completion Date : Mar 2009
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Akshat Jain
    • Subhas Nigam
    • R D Sharma

  • Brief Scope of Work:
  • Detailed Engineering including Traffic survey, Topographical survey Design of Flyover, Detailing, Cost Estimate etc.

Design & cost Estimation of Trumpet Flyover at NOIDA Film City Crossing Near Shiv Mandir at NOIDA, Uttar Pradesh, India.
  • Name of Client: IL&FS Infrastructure Development Corporation Limited
  • Project Address: 10, Community Center, 2nd Floor, East of Kailash, New Delhi-110 065
  • Total Length(Km): 270
  • Cost of Consultancy (IN/$): ₹ Rs. 6750000 $ 86538.46
  • Start Date: July 2012
  • Completion Date : Dec 2012
  • Name of the Key persons Deployed
    • A Bhattacharya
    • S Mondal
    • N Towari
    • P Hazra

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization alignment, design of major and minor structures, costing and preparation of bid document.

Preparation of Detailed Project Repot, Tender Documents And Evaluation of Tender For Rural Roads And Bridges In Jharkhand.
  • Name of Client: New Okhla Industrial Development Authority Administrative Complex
  • Project Address: Sector 6, Noida – 201301, Gautam Budh Nagar Uttar Pradesh, India
  • Total Length(Km): -
  • Cost of Consultancy (IN/$): ₹ Rs. 1,400,000 $ 23,333.33
  • Start Date: May 2009
  • Completion Date : Aug 2009
  • Name of the Key persons Deployed
    • Arindam B
    • Akshat Jain
    • C D Singh
    • R D Sharma
    • Subhas Nigam

  • Brief Scope of Work:
  • Traffic study and Detail design of Junctions. Preparation of Final Drawings

  • Name of Client: West Bengal State Rural Development Agency Howrah 2 division
  • Project Address: Howrah Zila Parishad Compund, 10, Biplabi Haren Ghosh Sarani Howrah-711101
  • Total Length(Km): 500
  • Cost of Consultancy (IN/$): ₹ Rs. 14000000 $ 179487.18
  • Start Date: June 2012
  • Completion Date : July 2012
  • Name of the Key persons Deployed
    • A Bhattacharya
    • S Mondal
    • N Towari
    • P Hazra

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization alignment, design of major and minor structures, costing and preparation of bid document.

Preparation of DPR for PMGSY Road works 2011-12 in respect of 500+ to 800 unconnected habitations of Uluberia-I,II Block in the district of Howrah in West Bengal.
  • Name of Client: New Okhla Industrial Development Authority Administrative Complex
  • Project Address: Sector 6, Noida – 201301, Gautam Budh Nagar Uttar Pradesh
  • Total Length(Km): -
  • Cost of Consultancy (IN/$): ₹ Rs. 110,000 $ 1,833.33
  • Start Date: Nov 2009
  • Completion Date : Mar 2010
  • Name of the Key persons Deployed
    • Sidharta Sinha
    • P Joshi
    • K Suresh

  • Brief Scope of Work:
  • Traffic study and Detail design of Junctions. Preparation of Final Drawings

  • Name of Client: Chhattishgarh Highways Development Corporation Ltd (CHDCL)
  • Project Address: F-6, Avanti Vihar Sector-1, Raipur 492006, Chhattishgarh
  • Total Length(Km): 37
  • Cost of Consultancy (IN/$): ₹ Rs. 4,000,000 $ 57142.86
  • Start Date: May 2008
  • Completion Date : Oct 2008
  • Name of the Key persons Deployed
    • Col Ashok Madan
    • Akshat Jain
    • R D Sharma
    • Subhas Nigam
    • C D Singh
    • Arindam B
    • Dr Ravisankar

  • Brief Scope of Work:
  • Detailed engineering, location survey, design of major and minor structures along the existing alignment and finalization of widening scheme, costing and preparation of bid document. (The project involves Land Acquisition for 37 km.)

Preparation of DPR for Khairagarh – Lanjhi Road in Chattisgarh, India
  • Name of Client: Chhattishgarh Highways Development Corporation Ltd (CHDCL)
  • Project Address: F-6, Avanti Vihar Sector-1 Raipur 492006 (Chhattisgarh)
  • Total Length(Km): 45
  • Cost of Consultancy (IN/$): ₹ Rs. 5,200,000 $ 74285.71
  • Start Date: May 2007
  • Completion Date : Oct 2007
  • Name of the Key persons Deployed
    • Col Ashok Madan
    • Akhsat Jain
    • Prasant Joshi
    • R D Sharma
    • Subhas Nigam
    • Dr Ravishankar
    • Arun Kumar
    • C D Singh
    • Arindam B

  • Brief Scope of Work:
  • Detailed engineering, design of road including one major bridge and two minor bridges. (The project involves Land Acquisition for 45 km.)

Preparation of Detailed Design Report for Raipur – Bilaspur NH 200 from Km 71 to Km 116 in Chhattisgarh, India Including one Rail Over Bridge cum flyover
  • Name of Client: Chhattishgarh Highways Development Corporation Ltd (CHDCL)
  • Project Address: F-6, Avanti Vihar Sector-1, Raipur 492006 (CG), India, +917714268371
  • Total Length(Km): 7
  • Cost of Consultancy (IN/$): ₹ Rs. 2,800,000 $ 40000
  • Start Date: Apr 2008
  • Completion Date : Sept 2008
  • Name of the Key persons Deployed
    • Col Ashok Madan
    • A Jain
    • R D Sharma
    • Subhas Nigam
    • C D Singh
    • Arindam B
    • Dr Ravishankar

  • Brief Scope of Work:
  • Detailed engineering, location survey, design of major structure all along the existing disused canal without disturbing the existing network. (The project involves Land Acquisition for 7 km.)

Detailed Project Repot for the Elevated Road over the canal in Raipur City, Chattisgarh, India.
  • Name of Client: Bengal Srei/ Kolkata Metropolitan Development Authority
  • Project Address: Unnayan Bhawan, Block-G, Salt Lake, Kolkata-91 India
  • Total Length(Km): 3.8
  • Cost of Consultancy (IN/$): ₹ Rs. 2,500,000 $ 41,666.67
  • Start Date: Feb 2010
  • Completion Date : June 2010
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • Prabhat Biswas
    • Biraj Mondal
    • Akshat Jain

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Traffic survey and forecast, Detail design, Cost Estimate etc.

Preparation of Detailed Project Report of construction of Flyover cum ROB (structure length- 400m) from Kona Expressway to connect Andul Road in Kolkata, West Bengal, India.
  • Name of Client: Kolkata Metropolitan Development Authority
  • Project Address: Unnayan Bhawan, Block-G, SaltLake, Kolkata-91 India
  • Total Length(Km): 2.4
  • Cost of Consultancy (IN/$): ₹ Rs. 1,350,000 $ 22,500
  • Start Date: Feb 2010
  • Completion Date : Mar 2010
  • Name of the Key persons Deployed
    • C D Singh
    • Arindam B
    • K Prasad
    • Prabhat Biswas
    • Kanai Pal
    • Subhas Nigam

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Traffic survey and forecast, Detail design, Cost Estimate etc.

Preparation of Detailed Project Report of construction of Flyover cum ROB on AP Banerjee Rd. connecting Ghosh Para Road and Kalyani Highway near Kolkata, West Bengal, India under KMDA.
  • Name of Client: Rajasthan State Road Development and Construction Corporation Ltd
  • Project Address: Setu Bhawan, opp. Jhalana Doongri Jaipur-Agra Bypass Jaipur -302004
  • Total Length(Km): 107
  • Cost of Consultancy (IN/$): ₹ Rs. 3,413,970 $ 48771
  • Start Date: Mar 2010
  • Completion Date : Oct 2010
  • Name of the Key persons Deployed
    • Sudipta De
    • Arindam B
    • K Prasad
    • Prabhat Biswas
    • Kanai Pal
    • Subhas Nigam
    • S Verma
    • Madhusudan

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures including R.O.B. along the existing alignment and finalization of widening scheme, costing and preparation of bid document.(The project involves Land Acquisition for 107 km.)

Preparation of Detailed Project Report for Development of Dabok – Mavali- Fatehnagar – Kapasan - Chittorgarh Road (SH-9) in Rajasthan, India	Fatehnagar – Kapasan - Chittorgarh Road Highway in Rajasthan	Fatehnagar – Kapasan - Chittorgarh Road Highway in Rajasthan Including  two ROB
  • Name of Client: Rajasthan State Road Development and Construction Corporation Ltd
  • Project Address: Setu Bhawan, opp. Jhalana Doongri Jaipur-Agra Bypass Jaipur -302004
  • Total Length(Km): 62.4
  • Cost of Consultancy (IN/$): ₹ Rs. 1,803,360 $ 25762.29
  • Start Date: June 2012
  • Completion Date : Dec 2012
  • Name of the Key persons Deployed
    • Sudipta Dey
    • Subhas Malhotra
    • Prabhat Biswas
    • RD Sharma
    • K Prasad
    • Subhas Nigam
    • S Verma
    • Madhusudan

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures. along the existing alignment and finalization of widening scheme, costing and preparation of bid document.

Consultant for Preparation of Detailed Project Report for development of Kota- Kaithoon-Sangod- Bapawar Road (SH-51)9/600 to 72/0
  • Name of Client: IL&FS Infrastructure Development Corporation Limited
  • Project Address: 10, Community Center, 2nd Floor, East of Kailash, New Delhi-110 065
  • Total Length(Km): 10, Community Center, 2nd Floor, East of Kailash, New Delhi-110 065
  • Cost of Consultancy (IN/$): ₹ Rs. 550,000 $ 9,166.67
  • Start Date: Oct 2013
  • Completion Date : Mar 2014
  • Name of the Key persons Deployed
    • A Bhattacharya
    • P Hazrah
    • S Mondal
    • S Majhi
    • Subrata Dey
    • S Karfa

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Detail design, Sub-soil Investigation, Preparation of GAD, Design Calculation, Hydrology and Hydraulic Analysis, Preparation of BOQ etc.

Preparation of Detailed Project Report for 3 Bridges in different Blocks in Godda in the State of Jharkhand. under PMGSY package.
  • Name of Client: IL&FS Infrastructure Development Corporation Limited
  • Project Address: 10, Community Center, 2nd Floor, East of Kailash, New Delhi-110 065
  • Total Length(Km): 4 Bridges
  • Cost of Consultancy (IN/$): ₹ Rs. 1,029,000 $ 17,150
  • Start Date: Oct 2013
  • Completion Date : Mar 2014
  • Name of the Key persons Deployed
    • A Bhattacharya
    • P Hazrah
    • S Mondal
    • S Majhi
    • Subrata Dey
    • S Karfa

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Detail design, Sub-soil Investigation, Preparation of GAD, Design Calculation, Hydrology and Hydraulic Analysis, Preparation of BOQ etc.

Preparation of Detailed Project Report for 4 Bridges in different Blocks in Ranchi in the State of Jharkhand under PMGSY package.
  • Name of Client: Public Work Department Meghalaya
  • Project Address: Chief Engineer, National Highway, PWD (Roads), Meghalaya, Shillong-793001
  • Total Length(Km): 8 Bridges
  • Cost of Consultancy (IN/$): ₹ Rs. 416,500 $ 6,941.67
  • Start Date: July 2012
  • Completion Date : June 2014
  • Name of the Key persons Deployed
    • A Bhattacharya
    • P Hazrah
    • S Mondal
    • S Majhi
    • Subrata Dey
    • S Karfa

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Detail design, Sub-soil Investigation, Preparation of GAD, Design Calculation, Hydrology and Hydraulic Analysis, Preparation of BOQ etc.

Preparation of Detailed Project Report for 8 Bridges along New Alignment of Bypass around Samanda an Extended part of NH 44E in the state of Meghalaya.
  • Name of Client: Public Work Department Meghalaya
  • Project Address: Chief Engineer, National Highway, PWD (Roads), Meghalaya, Shillong-793001
  • Total Length(Km): 15 Bridges
  • Cost of Consultancy (IN/$): ₹ Rs. 1,249,500 $ 20,825
  • Start Date: July 2012
  • Completion Date : June 2014
  • Name of the Key persons Deployed
    • A Bhattacharya
    • P Hazrah
    • S Mondal
    • S Majhi
    • Subrata Dey
    • S Karfa

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Detail design, Sub-soil Investigation, Preparation of GAD, Design Calculation, Hydrology and Hydraulic Analysis, Preparation of BOQ etc.

Consultancy Services for Preparation of Detailed Project Report for 15 Bridges in the section of Nongstion-Tura in the state of Meghalaya.
  • Name of Client: Public Work Department Meghalaya
  • Project Address: Chief Engineer, National Highway, PWD (Roads), Meghalaya, Shillong-793001
  • Total Length(Km): 19 Bridges
  • Cost of Consultancy (IN/$): ₹ Rs. 1,297,700 $ 21,628.33
  • Start Date: July 2012
  • Completion Date : June 2014
  • Name of the Key persons Deployed
    • A Bhattacharya
    • P Hazrah
    • S Mondal
    • S Majhi
    • Subrata Dey
    • S Karfa

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Detail design, Sub-soil Investigation, Preparation of GAD, Design Calculation, Hydrology and Hydraulic Analysis, Preparation of BOQ etc.

Consultancy Services for Preparation of Detailed Project Report for 19 Bridges in the section of Shillong-Nongstion, Sohiong Bypass and Nongstion Bypass in the state of Meghalaya.
  • Name of Client: Rajasthan State Road Development and Construction Corporation Ltd
  • Project Address: Setu Bhawan, opp. Jhalana Doongri Jaipur-Agra Bypass Jaipur -302004
  • Total Length(Km): 105
  • Cost of Consultancy (IN/$): ₹ Rs. 4,007,043 $ 57243.47
  • Start Date: April 2010
  • Completion Date : Oct 2010
  • Name of the Key persons Deployed
    • Sudipta Dey
    • Subhas Malhotra
    • Prabhat Biswas
    • RD Sharma
    • K Prasad
    • Subhas Nigam
    • S Verma
    • Madhusudan

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures including R.O.B. along the existing alignment and finalization of widening scheme, costing and preparation of bid document.(The project involves Land Acquisition for 105 km.)

Preparation of Detailed Project Report for Development of 2 laning of  Pali-Gomti Road (Sh-67/16) in Rajasthan, India	Fatehnagar – Kapasan - Chittorgarh Road Highway in Rajasthan	Fatehnagar – Kapasan - Chittorgarh Road Highway in Rajasthan
  • Name of Client: Rajasthan State Road Development and Construction Corporation Ltd
  • Project Address: Setu Bhawan, opp. Jhalana Doongri Jaipur-Agra Bypass Jaipur -302004
  • Total Length(Km): 54
  • Cost of Consultancy (IN/$): ₹ Rs. 2,626,650 $ 37523.57
  • Start Date: May 2010
  • Completion Date : Nov 2010
  • Name of the Key persons Deployed
    • Sudipta De
    • SM Ghosh
    • Col. A Madan
    • Prabhat Biswas
    • R D Sharma
    • P Joshi
    • Subhas Nigam
    • S Verma
    • Madhusudan

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures including R.O.B. along the existing alignment and finalization of widening scheme, costing and preparation of bid document.(The project involves Land Acquisition for 54 km.)

Preparation of Detailed Project Report for Development of 4 laning of Hanumangarh-Pilbanga-Suratgarh Road (MDR-103) in Rajasthan, India Including  two ROB	Fatehnagar – Kapasan - Chittorgarh Road Highway in Rajasthan	Fatehnagar – Kapasan - Chittorgarh Road Highway in Rajasthan
  • Name of Client: West Bengal Highway Development Corporation
  • Project Address: HRBC Bhawan, 4th & 5th Floor, Munsi Premchand Sarani, Kolkata 700 021
  • Total Length(Km): 18.4
  • Cost of Consultancy (IN/$): ₹ Rs. 1,700,000 $ 24285.71
  • Start Date: Jan 2014
  • Completion Date : Mar 2014
  • Name of the Key persons Deployed
    • A Bhattacharya
    • B Mondal
    • C K Bafna
    • R D Sharma

  • Brief Scope of Work:
  • Detailed engineering, location survey, design of major and minor structures along the existing alignment and finalization of widening scheme, costing and preparation of bid document.

Preparation of DPR for widening and strengthening of  Barjora - Mejhia (Durlavpur more) road, in the State of West Bengal.
  • Name of Client: Haryana State Roads and Bridges Development Corporation Ltd
  • Project Address: PWD Campus, Near Rest House Building, Civil Line. Gurgaon, Haryana - 122001
  • Total Length(Km): 38.4
  • Cost of Consultancy (IN/$): ₹ Rs. 1,344,196 $ 19202.8
  • Start Date: Feb 2015
  • Completion Date : Oct 2015
  • Name of the Key persons Deployed
    • P Hazra
    • Arindam B
    • B N Mukherjee
    • Biraj Mondal
    • C K Bafna
    • S Mondal

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Traffic survey and forecast, Detail design, Cost Estimate etc.

Preparation of Detailed Project Report for the 4-laning of existing Gurgaon-Pataudi-Rewari road (SH-26) from Km 12.00 to 50.410 in Gurgaon &Rewari Districts in the state of Haryana.
  • Name of Client: JKM Infra Projects Limited
  • Project Address: A-28, Sec-9, Noida - 201301, U.P.
  • Total Length(Km): 40
  • Cost of Consultancy (IN/$): ₹ Rs. 5,500,000 $ 78571.43
  • Start Date: July 2014
  • Completion Date : Dec 2015
  • Name of the Key persons Deployed
    • P Hazra
    • Arindam B
    • B N Mukherjee
    • Biraj Mondal
    • C K Bafna
    • S Mondal

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Traffic survey and forecast, Detail design, Cost Estimate etc.

Preparation Of DPR For Widening And Strengthening  of Existing Single Lane To Double Lane Carriageway  From Km 0 To 40 of NH 104 In The State of Bihar Toal Length: 40 km, 2 Lane
  • Name of Client: Paschim Medinipur ZillaParishad
  • Project Address: Head Post Office Road Midnapore - 721101 PaschimMedinipur West Bengal
  • Total Length(Km): 4x30m
  • Cost of Consultancy (IN/$): ₹ Rs. 1,139,096.00 $ 18,984.93
  • Start Date: Sep 2015
  • Completion Date : Aug 2016
  • Name of the Key persons Deployed
    • P Hazra
    • A Bhattacharya
    • S Mondal
    • S Majhi

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Detail design, Cost Estimate etc.

  • Name of Client: Paschim Medinipur ZillaParishad
  • Project Address: Head Post Office Road Midnapore - 721101 PaschimMedinipur West Bengal
  • Total Length(Km): 6x25m
  • Cost of Consultancy (IN/$): ₹ Rs. 1,469,096.00 $ 24,484.93
  • Start Date: Sep 2015
  • Completion Date : Aug 2016
  • Name of the Key persons Deployed
    • P Hazra
    • A Bhattacharya
    • S Mondal
    • S Majhi

  • Brief Scope of Work:
  • Detail Engineering including Topographical survey, Detail design, Cost Estimate etc.

  • Name of Client: GOVERNMENT OF WEST BENGAL
  • Project Address: Office of the Executive Engineer N. H. Division No. XII, P.W. (Roads) Directorate
  • Total Length(Km): 44
  • Cost of Consultancy (IN/$): ₹ Rs. 55,000,00 $ 78571.43
  • Start Date: Oct 2018
  • Completion Date : Jan 2019
  • Name of the Key persons Deployed
    • A Bhattacharya
    • S Mondal
    • S Thakur
    • S Dey
    • S Majhi

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures along the existing alignment and finalization of widening scheme, Traffic Survey, Geotechnical Investigation, Bitumen Core Cutting,

Preparation of Detailed Project Report for Strengthening of NH -60 for the stretch 330 kmp – 374 kmp in the district of Birbhum, West Bengal.
  • Name of Client: M P AGARWALA
  • Project Address: B-Royal Silver Tower, Lachit Nagar Main Road. Next to Bye Lane-I Ulubari, Guwahati - 781 007, India
  • Total Length(Km): 25.66
  • Cost of Consultancy (IN/$): ₹ Rs. 72,000,00 $ 120,000
  • Start Date: Oct 2016
  • Completion Date : Jan 2017
  • Name of the Key persons Deployed
    • A Bhattacharya
    • S Mondal
    • C D Singh
    • S Ghosh

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures along the existing alignment and finalization of widening scheme, Traffic Survey

Preparation of Detailed Project Report for Rehabilitation and Up-Gradation of Tura - Mankachar Road from Two-Lane Carriageway in The State of Assam
  • Name of Client: NFR
  • Project Address: Maligaon, Guwahati
  • Total Length(Km): 52
  • Cost of Consultancy (IN/$): ₹ Rs. 8,60,00,000/- $ 1228571.43
  • Start Date: Feb 2016
  • Completion Date : Ongoing
  • Name of the Key persons Deployed
    • Kang Si
    • A Bhattacharya
    • P Hazra
    • Abhishek
    • S Dey
    • U Chakraborty
    • Niraj Tiwari
    • P Sengupta

  • Brief Scope of Work:
  • Detailed engineering, sub-soil investigation, wind tunnel test, seismic modelling for response analysis, alignment adjustment for final siting of long viaducts/ bridges, preparation of GFC for construction, revision for any changes in site during construction.

Design of 14 viaducts/ bridges for New BG line of Bairabi – Sairang section in Mizoram
  • Name of Client: MANIPUR TRIBAL DEVELOPMENT CORPORATION
  • Project Address: Lamphelpat, Imphal, Manipur - 795001. 0385-00000
  • Total Length(Km): 67
  • Cost of Consultancy (IN/$): ₹ Rs. 2,65,00000 $ 378571.43
  • Start Date: Sep. 2017
  • Completion Date : May 2018
  • Name of the Key persons Deployed
    • A Bhattacharya
    • S Mondal
    • Subrata Dey
    • S Maji
    • S K Thakur

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures along the existing alignment and finalization of widening scheme, Traffic Survey

Consultancy Services for Appointment of Technial Consultant to Carry out the Feasibility Study and Preparation of Detailed Project Report for the Mebo-Dholla Road In The State of Arunachal Pradesh And Assam.
  • Name of Client: Faridabad Smart City Limited/LASA
  • Project Address: Nain Sadhan building , Plot No.35, Sector 20A, Haryana 121001
  • Total Length(Km): 162
  • Cost of Consultancy (IN/$): ₹ Rs. 45,930,000 $ 765,500
  • Start Date: Sep 2017
  • Completion Date : Jan 2018
  • Name of the Key persons Deployed
    • A Bhattacharya
    • S Majhi
    • N Tiwari
    • S Karfa
    • S Malik

  • Brief Scope of Work:
  • Topographical Survey Shiver Network Survey Under Ground Pipe Line Survey

  • Name of Client: VALECHA ENGINEERING LIMITED
  • Project Address: Valecha Chambers, 4th Floor, Andheri New Link Road, Andheri (West), Mumbai - 400 053 Off: 022- 26733625 -29 (5 Lines), / Fax: 022- 26733945
  • Total Length(Km): 50
  • Cost of Consultancy (IN/$): ₹ Rs. 24,600,000 $ 351428.57
  • Start Date: Mar 2018
  • Completion Date : Ongoing
  • Name of the Key persons Deployed
    • Arindam B
    • P Hazra
    • Rajeev Kumar
    • S Majhi
    • D T Kumawat

  • Brief Scope of Work:
  • Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures along the existing alignment and finalization of widening scheme, Traffic survey and forecast, costing and preparation of bid document.

Preparation of Detailed Project Report for Rehabilitation and up-gradation of NH-43 from Km 130.000 to km 180.000 (Kanker to Bedma section) to two lane with paved shoulder in the state of Chhattisgarh under NHDP-IV through EPC basis.
  • Name of Client: Bihar State Road Development Corporation Limited (BSRDC)
  • Project Address: RCD Mech. Workshop Campus, Sheikhpura, Patna - 800 014, Bihar, India
  • Total Length(Km): 178
  • Cost of Consultancy (IN/$): ₹ Rs. 19,430,000 $ 277571.43
  • Start Date: Jan 2011
  • Completion Date : Ongoing
  • Name of the Key persons Deployed
    • Col A Madan
    • S M Ghosh
    • A Bhattacharya
    • S Chatterjee
    • R D Sharma
    • Subhas Nigam
    • S Verma
    • Madhusudan

  • Brief Scope of Work:
  • Detailed engineering, location survey, design of major and minor structures along the existing alignment and finalization of widening scheme, costing and preparation of bid document. (The project involves Land Acquisition for 178km.)

Preparation of Detailed Project Report of Indo-Nepal Border Road in Bihar, India (MHA, GOI Pkg-4) of 178km, 2lane with Paved shoulder.