Traffic and engineering surveys, Traffic projection, generation of Toll.
Pre-bid Engineering and evaluation of Raipur - Arang Section of NH-6 under BOT scheme of Non - NHDP Corridors.
Pre-bid Engineering and evaluation of Meerut - Muzaffar Nagar Section of NH-58 under BOT scheme of Non - NHDP Corridors in Uttar Pradesh, India.
Pre-bid Engineering of Vadodara – Bharuch Section of NH 8 proposed to be taken up on B.O.T Basic in Gujarat, India.
Preliminary Design of Structure, Costing and Traffic and engineering surveys, Traffic projection, generation of Toll and Development of Financial Model.
Traffic and engineering surveys, Traffic projection, generation of Toll and Development of Financial Model.
Traffic and engineering surveys, Traffic projection, generation of Toll and Development of Financial Model.
Value engineering through Re-profiling the entire corridor. Review of interchanges, develop cross section, report on environmental issues, complete ITS architecture and electrification design, design of Toll Plaza incl. its Office Plaza, Bird Observatory, rescue center preparation of cost and specifications.
Pre-bid engineering, preliminary costing, preparation of typical drawings.
Traffic and engineering surveys, Traffic projection, generation of Toll, Preliminary design of Roads and Structures, GPS routing, rate analysis, BOQ, costing
Traffic and engineering surveys, Traffic projection, generation of Toll, Preliminary design of Roads and Structures, GPS routing, rate analysis, BOQ, costing
Traffic and engineering surveys, Traffic projection, generation of Toll.
Traffic and engineering surveys, Traffic projection, generation of Toll.
Traffic and engineering surveys, Traffic projection, generation of Toll.
Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structures including R.O.B. along the existing alignment and finalization of widening scheme, costing and preparation of bid document.
Traffic and engineering surveys, Traffic projection, generation of Toll and Financial analysis and Costing
Detailed engineering, location survey, finalization of Bypass alignment, design of major and minor structure along the existing alignment and finalization of widening scheme, costing and preparation of bid document. Traffic and engineering surveys, Traffic projection, generation of Toll and Financial analysis and Costing
Detailed engineering, location survey, study of proposed Bypass alignment, design of major and minor structure along the existing alignment including the option study for the long bridge of 3.144km across river Krishna and study the appropriateness of widening scheme, estimation of complete project and preparation of bid document. Traffic surveys and engineering surveys, Traffic projection, generation of Toll and Financial analysis for advising the viability.
Detail Engineering including Topographical survey, Traffic survey and forecast, Axle Load Survey, Cost Estimate etc.
Detail Engineering, Traffic survey and forecast, Cost Estimate etc.
Detail Engineering, Traffic survey and forecast, Cost Estimate etc.
Detailed engineering, Sub Soil Investigation, Axle Load Survey, BBD Survey, Costing, preparation of BOQ, design of major and minor structures including R.O.B.along the alignment.
Detailed engineering, Sub Soil Investigation, Axle Load Survey, BBD Survey, Costing, preparation of BOQ, design of major and minor structures including R.O.B. along the alignment.
Detailed engineering, Sub Soil Investigation, Axle Load Survey, BBD Survey, Costing, preparation of BOQ, design of major and minor structures including R.O.B. along the alignment.
Detailed engineering, Sub Soil Investigation, Axle Load Survey, BBD Survey, Costing, preparation of BOQ, design of major and minor structures including R.O.B.along the alignment.